Creative Playthings Manchester Premium Pack 9 Assembly Instructions
Text of Creative Playthings Manchester Premium Pack 9 Assembly Instructions
MANCHESTER PREMIUM PACK 9
MANC9WPP9-100 Rev B (05-20)
© Copyright 2018, Creative Playthings
CHILDHOOD STARTS HERE
MANC9WPP9
Manchester Premium Pack 9
• Assemble the Manchester tower as shown in the instructions in Man-
chester Box 1 (63069-601).
• Manchester step 39. Wait to install the wall slats.
• Assemble both Dormers (SM963-402). Install one dormer on the
main tower roof before the swing beam, slide, or fun deck for better
ladder access.
•
© Copyright 2018, Creative Playthings
MANCHESTER PREMIUM PACK 9
MANC9WPP9-100 Rev B (05-20)
Page 2
• Spiral mount step 4. Do not install the cross brace.
• Spiral mount step 7. Before installing the side supports,
screw down the narrow deck board omitted in step 22 of
the fun deck assembly. If the deck board blocks a hole
drilled in spiral step 1, insert 5/16" weld nuts first.
• Spiral mount step 9. Stop here before installing the slide
entrance. Fi