Eastern Energy DuraSite 3000 Operation & User’s Manual

Text of the manual

EASTERN ENERGY SERVICES PTE LTD.

60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG 415979 Singapore Telephone: +65-6748 6911 Fax: +65-6748 6912 Email: [email protected] Website: www.eesgroup.com

Table Of Contents

1. Introduction 3 2. About this Manual 3 3. Contacting YZ Systems 3 4. Vessel Components 4 5. Specifications 5 6. Application 6 7. Theory of Operation 7 8. DuraSite Installation & Use 8 9. Cylinder Maintenance 10 10. Diagrams DuraSite Sample Vessel 12 Adjustable Relief Valve (Optional) 13 EASTERN ENERGY SERVICES

Congratulations on your purchase of the DuraSite

Sample Vessel. You've made a wise measurement investment for your company. Before you begin installation, insure that all of the necessary components are present. TFE tape, Stainless Steel Tubing, and Tubing Fittings may be required. 2. About This Manual: This User's Guide provides a step

4. Vessel Components:

The primary components of the DuraSite Sample Vessel are illustrated here. EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG 415979 Singapore Telephone: +65-6748 6911 Fax: +65-6748 6912 Email: [email protected] Website: www.eesgroup.com

Visual Level Indication:

Magnetic Primary Materials: 316 Stainless Steel and Aluminum Carrying Case: Optional Size: 3000 cc EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG 415979 Singapore Telephone: +65-6748 6911 Fax: +65-6748 6912 Email: in

Accurate sampling and storage of natural gas and liquid

hydrocarbons equates to revenue, and in many cases a large amount of revenue. One of the major links in the sample storage process is the sample container or sample cylinder. In recent years, the Constant Pressure Cylinder has become the storage cylinder of choice, principally due to i

7. Theory of Operation:

The DuraSite Sample Vessel The DuraSite Sample Vessel consists of a metal cylinder precisely machined and polished on the inside surface with removable end heads for easy access to the inside of the cylinder. The heads are drilled and tapped to incorporate isolation valves, gauges, and pressure rupture disc assemblies. Contained ins

Typical use of the vessel would be as follows:

Step 1: In The Lab Connect a regulated inert gas supply to the pre-charge valve. The product valve should be open. By carefully controlling the pre-charge valve and the regulator, the vessel can be slowly charged with pre-charge gas (NOTE: This should be done slowly to prevent slam- ming the piston down to

When the vessel becomes a maximum of 80% full

(see volume indicator), all valves should be closed. The product connection is slowly broken in order to vent any trapped product. After vessel removal, all connections should be checked for leaks and the pre-charge and product valve ports capped to pre- vent leakage. Step 6: The vessel should be label

Time, Temperature, Pressures, Sample Quality, and the number of Sample Cycles will all have

an affect on the need for maintenance. · Preventative Maintenance In general, a preventative maintenance program is for the purpose of trying to anticipate possible maintenance that will be required and to choose when to perform that maintenance prior

Other Industrial Equipment Manuals