Eastern Energy DuraSite 3000 Operation & User’s Manual
Text of the manual
EASTERN ENERGY SERVICES PTE LTD.
60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG 415979 Singapore
Telephone: +65-6748 6911 Fax: +65-6748 6912
Email: [email protected] Website: www.eesgroup.com
Table Of Contents
1. Introduction
3
2. About this Manual
3
3. Contacting YZ Systems
3
4. Vessel Components
4
5. Specifications
5
6. Application
6
7. Theory of Operation
7
8. DuraSite Installation & Use
8
9. Cylinder Maintenance
10
10. Diagrams
DuraSite Sample Vessel
12
Adjustable Relief Valve (Optional) 13
EASTERN ENERGY SERVICES
Congratulations on your purchase of the DuraSite
Sample Vessel. You've made a wise measurement
investment for your company.
Before you begin installation, insure that all of the
necessary components are present. TFE tape,
Stainless Steel Tubing, and Tubing Fittings may be
required.
2. About This Manual:
This User's Guide provides a step
4. Vessel Components:
The primary components of the DuraSite Sample
Vessel are illustrated here.
EASTERN ENERGY SERVICES PTE LTD.
60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG 415979 Singapore
Telephone: +65-6748 6911 Fax: +65-6748 6912
Email: [email protected] Website: www.eesgroup.com
Visual Level Indication:
Magnetic
Primary Materials:
316 Stainless Steel and Aluminum
Carrying Case:
Optional
Size:
3000 cc
EASTERN ENERGY SERVICES PTE LTD.
60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG 415979 Singapore
Telephone: +65-6748 6911 Fax: +65-6748 6912
Email: in
Accurate sampling and storage of natural gas and liquid
hydrocarbons equates to revenue, and in many cases
a large amount of revenue. One of the major links in the
sample storage process is the sample container or
sample cylinder.
In recent years, the Constant Pressure Cylinder has
become the storage cylinder of choice, principally due
to i
7. Theory of Operation:
The DuraSite
Sample Vessel
The DuraSite Sample Vessel consists of a metal
cylinder precisely machined and polished on the
inside surface with removable end heads for easy
access to the inside of the cylinder. The heads are
drilled and tapped to incorporate isolation valves,
gauges, and pressure rupture disc assemblies.
Contained ins
Typical use of the vessel would be as follows:
Step 1: In The Lab
Connect a regulated inert gas supply to the pre-charge
valve. The product valve should be open. By carefully
controlling the pre-charge valve and the regulator, the
vessel can be slowly charged with pre-charge gas
(NOTE: This should be done slowly to prevent slam-
ming the piston down to
When the vessel becomes a maximum of 80% full
(see volume indicator), all valves should be closed.
The product connection is slowly broken in order to
vent any trapped product. After vessel removal, all
connections should be checked for leaks and the
pre-charge and product valve ports capped to pre-
vent leakage.
Step 6:
The vessel should be label
Time, Temperature, Pressures, Sample Quality, and the number of Sample Cycles will all have
an affect on the need for maintenance.
·
Preventative Maintenance
In general, a preventative maintenance program is for the purpose of trying to anticipate possible
maintenance that will be required and to choose when to perform that maintenance prior