activTek INDUCT 5000 Manual
Read Online
Read the activTek INDUCT 5000 Manual online using the built-in PDF viewer.
Key Pages of Document
Location for Protective Earth Line. WARNING: To reduce the risk of electric shock, this equipment may have a grounding type plug that has a third (grounding) pin. This plug will only fit into a grounding type power outlet. If the plug does not fit into the outlet, contact qualified personnel to install the proper outlet. Do not alter the plug in any way. WARNING: This unit must be ...
Ozone ActivePure® Cell Item # US70955 (Not available in California) INSTALLATION HARDWARE RECOMMENDED INSTALLATION TOOLS YOU MAY ALSO NEED: Utility Knife Tin Snips (for metal ductwork) CAUTION: When the unit is installed in a roof mounted HVAC system, the unit must be protected from the elements. 3 1/2” Hole Saw for wood or metal (recommended) Drill/Power Driver Phillips S ...
activTek INDUCT 10000 - Min. 12” x 12” INSTALLATION CLEARANCES 1. Unit should be installed after the air handler in the HVAC system. 2. The duct work around the installation area should be clean and dry to ensure proper adhesion of the gasket materials and any tape used. 3. Depending on model, one opening (activTek INDUCT 5000) or two openings (activTek INDUCT 10000) ...
activTek INDUCT 5000 - Min. 10” x 10” activTek INDUCT 10000 - Min. 12” x 12” ...
1. Find the optimal position downstream from the air handler. Ensure location in duct has enough room for the mounting plate. It is recommended for maximum effectiveness that the unit be placed as close to the air handler as possible. NOTE: 2. Using the appropriate template included, mark location for installation. 3. Using a 4" (4 inch) hole saw, cut opening(s) into duct work. Cut the second hole for activTek INDUCT 10000 only. 4. P ...
1. Connect wires coming from the activTek INDUCT 5000/INDUCT 10000 unit to the fan relay as follows: NOTE: Disconnect power at the breaker or fuse panel before servicing unit. Always follow OSHA lockout procedures to prevent accidental exposure to electrical energy. 2. Connect the unit to the load side of the proper fan relay. 3. Be sure to ground the ballast by securing the unit to the metal surface of the AC unit or power box. 4. Ch ...
be sure the power to the unit is off. Always follow OHSA electrical lockout safety requirements to prevent Accidental release of energy during service or maintenance activities CHANGING THE ACTIVEPURE® CELL WARNING: UV Light in operation. Disconnect unit from power supply before servicing. Failure to follow warnings may result in severe eye damage. 2. Remove the activTek INDUCT ballast assembly by removing th ...
2. Open the ballast housing by removing the four (4) thumb screws then remove the cover. WARNING: Disconnect power at the breaker or fuse panel before servicing unit. CAUTION: Never attempt to check operation of the ActivePure® cell(s) by direct observation. Severe eye damage can result. Use the indicator lamps on the bottom of the ballast only. CAUTION: Disconnect power at the breaker or fuse panel before servicing unit. Always f ...
LAMP INDICATOR 6. Place new ballast into original location and secure using the two (2) nuts removed in step 4. 7. Replace cover and secure with the original four (4) screws. 8. Re-install unit if removed from duct. Reconnect power and check for proper operation (Lamp indicator should be lit when in operation). ...
Customer should not repackage and ship the INDUCT 5000 or INDUCT 10000 unit due to possibility of irreparable damage. For warranty service, please contact your activTek Distributor for the address of the nearest service center or call Customer Service at 866.736.0503. WHAT IS COVERED BY THIS WARRANTY We warrant the INDUCT 5000 or INDUCT 10000 (excluding filters) to the Customer, subject to the conditions belo ...
Name: DBG Group Investments, LLC dba activTek Environmental Model: activTek INDUCT 5000/10000 Manufacturer: DBG Group Investments, LLC This device complies with Part 18 of the FCC Rules. RESPONSIBLE PARTY DBG Group Investments, LLC dba activTek Environmental 300 East Valley Drive Bristol, VA 24201 Ph: 866.736.0503 Signature:___________________________ Printed Name: Andrew Eide Title: Vice President of Product Development and ...