GPM BENLAN Assembly Instructions Manual
Text of the manual
GLOBAL PROCUREMENT AND MARKETING LIMITED
1
TABLE WITH 2 BENCH SET
Assembly Instructions – Please keep for future reference
BENLAN
Dimensions
No. people
Assembly Time
SKU #
Width: 80cm
15 mins
(approx.)
BENLAN
Depth: 32cm
Height: 43.5cm
Important – Please read these instructions fully before starting assembly
If you need help or have damaged or missing
Safety and Care Advice
Important – Please read these instructions fully before starting assembly
•
Check you have all the
components and tools listed
on pages 4 and 5.
•
Remove all fittings from the
plastic bags and separate
them into their groups.
•
Keep children and animals
away from the work area,
small parts could choke if
swallowed.
•
Make
Components - Panels
Please check that you have all the components listed below before constructing your item.
Part No
Description
Qty
Size
(mm)
Thickness
(mm)
8
TOP PANEL
1
800X320
15
9
SIDE PANEL
2
420X300
15
10
SUPPORT PANEL
1
710X200
15
Important – Please read these instructions fully before starting assembly
If you need help or have damaged or missin
Components - Fixings
Please check that you have all the components listed below before constructing your item.
Note: The quantities below are the correct amount to complete the assembly. In some cases more fittings
may be supplied than are required.
(A)
X14
(B)
X14
(C)
X16
(D)
(E)
(F)
(G)
X8
(H)
X8
(I)
X8
(J)
(K)
(L)
(M)
(N)
(O)
(P)
(Q)
(R)
(S)
(T)
(U)
(V)
GLOBAL PROCUREMENT AND MARKETING LIMITED
1
TABLE WITH 2 BENCH SET
Assembly Instructions – Please keep for future reference
DINLAN
Dimensions
No. people
Assembly Time
SKU #
Width: 110cm
45 mins
(approx.)
DINLAN
Depth: 70cm
Height: 73cm
Important – Please read these instructions fully before starting assembly
If you need help or have damaged or missing
Safety and Care Advice
Important – Please read these instructions fully before starting assembly
•
Check you have all the
components and tools listed
on pages 4 and 5.
•
Remove all fittings from the
plastic bags and separate
them into their groups.
•
Keep children and animals
away from the work area,
small parts could choke if
swallowed.
•
Make