Creative Play ZENITH THREE MULTI Installation Instructions Manual

Text of Creative Play ZENITH THREE MULTI Installation Instructions Manual

pg 2 of 22

REF: Z103 - ZENITH THREE PARTS required PARTS required x3 (ZENITH TOWERS STANDARD FLOOR 90x90) x1 (RAMP ASSEMBLY) x1 (HEXBOARD RAMP) x1 (RAMP ROPE) x2 (90 x 90 CLATTERBRIDGE FLOOR) x1 (90 x 90 STANDARD FLOOR) x3 (PRE-ASSEMBLED PANEL) x1 (HEX CLIMBER) x1 LEFT (SLIDE SIDE) x1 RIGHT (SLIDE SIDE) x1 (SLIDE METAL FRAME)

pg 3 of 22

REF: Z103 - ZENITH THREE PARTS required PARTS required x6 (PLAYTEC BARRIER PANEL - FOR FLAT SIDE TIMBER) x1 (PLAYTEC SHOP BOTTOM PANEL) x1 PAIR (PLAYTEC SHOP BRACKET - PAIR A) x1 (PLAYTEC ASSEMBLED “SHOP” PANEL) x1 (PLAYTEC SHOP SHELF PANEL) x1 PAIR (PLAYTEC SHOP BRACKET - PAIR B) x2 (SLIDE CLIPS) x1 (1m SLIDE)

pg 4 of 22

REF: Z103 - ZENITH THREE PARTS required PARTS required x54 (M12 ´NYLOC´) x54 (Covered Ends) x74 (FM80‘ Brass screws’) x3 (FM40‘ Brass screws’) x14 (M12 x 200SQUARE CUP HEX BOLTS) x12 (M12 x 150 SQUARE CUP HEX BOLTS) x1 (FIREFIGHTERS POLE AND BRACKET) x1 (CLATTERBRIDGE) x1 (NET TUNNEL)

pg 5 of 22

REF: Z103 - ZENITH THREE PARTS required ( STANDARD ROOF ) x24(ROOF CLIPS) x3 (TOP ROOF CLIP) x6 (SIDE ROOF ) x3 (FRONT ROOF) x3 (BACK ROOF) x30 (N1 - TORKTAINER) x30 (3B- TORKTAINER) x12 (FM80 ‘ Brass screws’) PARTS required (RUSTIC ROOF ) x12 (TOP RUSTIC ROOF) x60(HALF ROUND TIMBERS) x6 x6 RR3 RR2 RR2 RR2 RR1 RR1 x192 (FM80 ‘ Brass screws’) x6 LEFT (SIDES RUSTIC ROOF) x6 RIGHT (SIDES RUSTIC ROOF)

pg 6 of 22

REF: Z103 - ZENITH THREE TOOLS required TIMBERS required Z103i Z103e Z103e Z103e Z103c Z103f Z103f Z103c Z103a Z103b Z103h Z103j Z103k Z103g Z103g Z103d Z103l Z103c

pg 7 of 22

REF: Z103 - ZENITH THREE Foundation Details FIREFIGHTERS POLE CLATTERBRIDGE SHOP FRONT NET TUNNEL CLIMBER SLIDE RAMP 600 Concrete + 150 Soil 350 Concrete + 150 Soil FIG.1

pg 8 of 22

REF: Z103 - ZENITH THREE = MINIMUM SPACE = SURFACE AREA Surfacing Details 4.35m 3.96m 3.05m 3.18m 1.90m 2.16m 3.92m 4.75m 2.50m 1.70m 1.5m 1.5m 2m

pg 9 of 22

REF: Z103 - ZENITH THREE 2 Installation Instructions Install timber UPRIGHTS Follow foundation details 1 Installation Instructions ENSURE: FLOOR CURVE FACES CLATTERBRIDGE NET TUNNEL Z103a Z103c Z103b Z103c Z103d Z103e Z103c ATTACH METAL FLOOR FRAMES AND HEX FLOORS Using 4x150mm M12 SQUARE CUP HEX BOLTS/ 4x Nylocs / 4x RED CAPS (PER FLOOR) Z103e Z103i Z103h Z103j Z103e

pg 10 of 22

REF: Z103 - ZENITH THREE Installation Instructions Attach the RAMP to Z103a and Z103b TIMBERS Using 2x @200mm M12 SQUARE CUP HEX BOLTS / 2x NYLOCS / 2x RED CAPS / 10x FM80 Brass Screws * RAMP HOLE - 148mm from the top of the floor - 850mm from the ground -1412mm from the top 3 Z103a Z103c Z103d Z103b

Creative Play Play Sets & Playground Equipment Owners Instructions: