Harrod ANC-019 Instructions
Text of Harrod ANC-019 Instructions
1450mm CRS for FBL-154 3 Seat Shelter
2400mm CRS for FBL-155 5 Seat Shelter
3825mm CRS for FBL-156 8 Seat Shelter
4775mm CRS for FBL-157 10 Seat Shelter
PLAN VIEW
SIDE VIEW
Fence Line
600
600
600
360 Socket
centre to
front of fence/
kick board
40
Play Area
ANC-019
Fibre Tech Pro Team Shelter Anchor
INS043
Revision 2
11/01/2016
Harrod UK Limited
©
Code:
Product:
View of Shelter with Anchors
Pack Contents
Socket Installation
Dig holes 600x600 square x
m
d
Remove the kickboard before
cutting the fence. Then notch
kickboard around Anchor Arm.
2
Drill Shelter Ready for Anchor Arms - Carefully lay the shelter on its front and offer up each Arm in turn and
using as a template; mark through each hole position as shown in Fig 2. Remove Arm and drill pilot hole
through the Shelter then open out to 13mm.
ANC-019
Fibre Tech Pro Team Shelter Anchor
Code:
Product:
Assembly Instructions
1
Cut Fence and Kickboard - M