1. Package Inside

In parallel kit, you will find the following items in the package:  1 PCS of parallel board  1 PCS of parallel cable  3 PCS OP relay board  1 PCS of share current cable  3 PCS of 2-pin red/black cables、3 PCS of 4-pin brown cables and 1 PCS of14-pin grey cable  3 PCS of brown wires(each with a yellow& white core) and 1 PC

2.2 Replace the CNTL board and COMMUNICATION board

Please ignore this step, if the the units you have bought were suitable for parallel function already. For Gallon 3-3 UPS (10K,15K,20K,30K),there are 2 control boards, one for PFC control , and the other for INV control, the following picture showing the different between these two boards, the pa

Step 1: Replace PFC control board:

Remove the white glue. Disconnect the 3-pin cable from CN7 of the PFC control board, demount the small PCBA board. Demount the 3 white screws, disconnect the 50-pin cable. Replace the PFC control board with a new one. It is better assemble the small PCBA first, then assemble the new PFC control board by install the 3 screws

Step 2: Replace the INV control

board: Remove the white glue, demount the screw. Then pull the INV control board. Flipping over the INV control board, you can see the glue on the connectors, remove the glue, then dis connect all the cables. Replace the INV control board with an new one, assemble the new board back to the INV1&2 board.

Step 3: Replace the communication

board: Take a new communication board, demount the 2 screws of the DB-15 port. Disconnect the cables on the communication board, and demount the srews that used to fasten the communication board to the rear panel. Replace the board with a new one, connect the cables, install the screws. 2.3 Parallel kit installation Step 1:

Step 3: Assemble the OP relay

boards to the location left of the OP EMI board. Step 4: Connect the OP relay control and OP voltage detect cables (4-pin brown cable): Connect CN001 to CN15 of INV1&2 board. Connect CN002 to CN16 of INV1&2 board. Connect CN003 to CN15 of INV3 board. Step 5: Connect the wires that demounted from the OP EMI board by “step2”:

Step 7: Take a new parallel

board, demount the 4 screws from the parallel port ( DB15 Connectors) Connect the “Parallel board power supply cable” to CN9 of parallel board. Connect the “S phase current equalizer cable” to CN10 of parallel board. Connect the “T phase current equalizer cable” to CN11 of parallel board. Step 8: Remove covers for para

Step 10: Connect the “Parallel

board power supply cable” (Short red/black cable) to CN10 of communication board. Step 11: Connect the “S phase current equalizer cable” (the longer red/black cable) to “CN20” of INV 1&2 board. Step 12: Connect the “T phase current equalizer cable” the longest red/black cable) to “CN 6” of INV 3 board.

Step 13: Connect the 14-pin

grey cable to CN11 of INV control board: Please reference to Step2 of part 2.2 to demount the INV control board from the INV1&2 board. Connect the 14-pin grey cable to CN11 of INV control board. Step 14: Assemble the INV control board back to INV1&2 board, and then make the 14-PIN grey cable through the middle iron board. Step 15:

Above is suitable for GALLON 3-3 10k, 15k, 20K,30K standard modle, for long backup modle, the difference is the