Gate House R100 Manual
Read Online
Read the Gate House R100 Manual online using the built-in PDF viewer.
R100 Manual : Key Pages of Document
ITEMS # 0254049, 0254061, 0254072, 0254076, 0016567, 0254099, 0254110, 0054116, 0254117, 0254126, 0254140, 0254150, 0254156 Francais p. 57 Español p. 113 Questions, problems, missing parts? Before returning to your retailer, call our customer service department at 1-888-442-2923, 8 a.m. - 5 p.m., CST, Monday - Friday. ATTACH YOUR RECEIPT HERE Ramp Run R242 Bottom Run R100 Landing for Right & Left Turn R342 Landing U Turn R442 Crossbeam RC536, RC548 Crossbrace RX536, RX548 Threshold RT536, RT548 Sq. Leg Extender RLQ66 Leg Extender RLT66 Leveling Foot RB210 MODELS # R100, R242, R342, R442, RB210, RC536/548, RT536 ...
Preparation........................................................................................................................................ 3 Package Contents for R242 Ramp Run..................................................................................... 4 Hardware Contents for R242 Ramp Run.................................................................................... 5 Package Contents for R100 Bottom Run......................................................... ...
Please read and understand this entire manual before attempting to assemble, operate or install the product. Before beginning assembly of product, make sure all parts are present. Compare parts with package contents list and hardware contents list. If any part is missing or damaged, do not attempt to assemble the product; call 1-888-442-2923. Tools Required for Assembly: Safety Glasses, Gloves, Tape Measure, Level, Carpenter’s Square, Drill with Phillips #3 bit and 3/8 in. hex nut driver, Hex Key, Utility Knife or Scissors, Combina ...
PART DESCRIPTION QUANTITY A6 Landing Leg (A6) Assem- bly 1 A7 Landing Leg (A7) Assem- bly 1 A8 Landing Sq. Leg (A8) As- sembly 2 C Sleeve Cap 4 G Side Rail 1 H Side Rail Bracket (pre- assembled) 1 I Side Rail Bracket (pre- assembled) 1 J Support Joist 4 K Support Joist Bracket 8 PART DESCRIPTION QUANTITY P Landing Crossbeam 65.25 in. 1 Q Landing Crossbeam 12.5 in. 1 R Landing Crossbeam 24.5 in. 1 S Beam Cover 65.5 in. 1 T Beam Cover 13.5 in. 2 U Beam Cover 25.5in. 2 V Beam Cover Bracket 2 PART SOLD SEPARATELY QUANTITY RC536 or RC548 Crossbeam 36 in. or 48 in. Need 1 ...
AA BB EE 1/4 x 3 in. Bolt Qty. 4 #14 x 1 in. HWH #3 Tek Screw Qty. 104 Handle Qty. 4 PP FF 1/4 in. x 3 1/4 in. Bolt Qty. 2 1/4 Lock Nut Qty. 6 ...
Crossbeam 48 in. RC548 Needed for: Bottom Run R100 Ramp Run R242 Landing Right or Left Turn R342 Landing U Turn R442 Threshold 36 in. RT536 Threshold 48 in. RT548 (2 Thresholds needed per project: one at entry of Bottom Run and one at end of ramp section) Can attach to: Bottom Run, Ramp Run, Landing for Right & Left Turn, Landing for U Turn Cross Brace 36 in. RX536 Cross Brace 48 in. RX548 Needed for: Ramp Run R242 when either post spans more than 22 in. from post base to top of crossbeam Z OO A1 PART DESCRIPTION QUANTITY A1 Cross Brace Angle 2 OO Bolt, 9/16 x 1-1/4 in. HWH TapFlex 4 PART DESCRIPTION ...
Needed for: Posts placed on slopinsg surface T Leg Extender RLT66 Needed for: T Leg Post more than 28 in. from post base to deck height on Landing for Right & Left Turn R342 or Landing for U Turn R442 Square Leg Extender RLQ66 Needed for: Square Post more than 28 in. from post base to deck height on Landing for Right & Left Turn R342 or Landing for U Turn R442 COORDINATING PIECES PART DESCRIPTION QUANTITY W Leg Attachment 1 Y Square Leg Extender 1 CC Screw, #8-18 x 1 in. PFH #2 Tek 1 PART DESCRIPTION QUANTITY W Leg Attachment 1 X Leg Extender 1 CC Screw, #8-18 x 1 in. PFH #2 Tek 1 X W Y W CC Pre-assembled Pre-assemb ...
Note: Site preparation is required for this ramp. Placing posts on a footing is highly recommended. Without footings, settling could occur. The manufacturer is not responsible for replacing parts dam- aged or property lost due to incorrect assembly. Note: Complete the site preparation and footings before unpacking parts and beginning assembly. To prepare ramp site, follow the steps below: 1) Consult local building codes before construction. 2) Before any digging, check with local utilities to determine location of buried cables, pipes, etc. 3) Posts require a minimum foundation and anchorage sufficient to support ...
R342 To join kits switch A5 T Leg Assembly with A7 Landing Leg COMMON SYSTEM CONFIGURATIONS Landing Left Turn R342 Landing U Turn R442 BEFORE ASSEMBLY: Layout posts in a rough approximation of desired configuration. Refer to planning guide at Lowes.com/ramps for more details. NOTE: R100 Bottom Run and R242 Ramp Run have two A5 T Leg Assemblies that accept a crossbeam. When joining a Bottom Run or Ramp Run to a land- ing, one A5 T Leg Assembly must be switched with a Landing Leg Assembly (A6 or A7) to accept a crossbeam on two sides. NOTE: Configurations can be combined as needed. NOTE: Start the ramp with the sectio ...
Hardware Used 2. If using Leveling Foot RB210, position under post and press down until the lock pops. Pivot post until two holes in foot are completely visible. Install two #8 x 3 in. screws (QQ) to lock Leveling Foot on post assembly. It will still pivot. 3 in. Slotted Flat Head Screw QQ 2 x 2 1. Before beginning assembly, open all kits and compare package contents with package contents and hardware contents lists to be certain all parts are accounted for. Next, identify all posts: the A5 T Leg Assemblies, A6 Landing Leg (A) Assemblies, A7 Landing Leg (B) Assemblies, and the A8 Land- ing Sq. Leg Assemblies. Lay ...
bracket (K) to a support joist (J) with #14 x 1 in. HWH #3 Tek Screws (EE). Recommended Tool (not included): drill with 3/8 in. hex nut driver Hardware Used #14 x 1 in. HWH #3 Tek Screw x 8 EE Hardware Used 4. Attach another support joist bracket (K) to the other end of the support joist (J) using #14 x 1 in. HWH #3 Tek Screws (EE). NOTE: Only attach support joist brackets (K) to both ends of the support joists (J) for R242 Ramp Runs, R342 Landings for Right & Left Turns and R442 Landings for U Turns (see Fig. 3A). Only attach support joist brackets (K) to one end of the support joists ...
Hardware Used 17. When the top of a crossbeam is more than 22 in. from the bottom of the post, cross braces RX536/RX548 (sold separately) must be attached. Attach the cross brace angles (A1) to the posts with 9/16 x 1-1/4 in. HWH TapFlex bolts (OO). Attach cross braces at first hole under the sleeve on the posts. OO Bolt, 9/16 x 1-1/4 in. HWH TapFlex x 4 18. When the top of the crossbeam is 34 in. or higher from the bottom of the post, leg extenders RLT66/RLQ66 (sold separately) must be attached. Remove pre-assembled #8-18 x 1 in. PFH #2 Tek Screw (CC) from extender, slide out adjustable post support and inse ...
and I) (pre-assembled) to match position shown. Attach with #14 x 1 in. screws (EE). Tighten the pre-assembled screws. NOTE: DO NOT OVER-TORQUE SCREWS. Recommended Tool (not included): drill with 3/8 in. hex nut driver #14 x 1 in. HWH #3 Tek Screw EE Landing Right & Left Turn R342 20. Identify posts and lay them out to match diagram for your turn. Also refer to the Common Configurations sec- tions on page 15. NOTE: The T Leg Assembly (A5) is not included with the R342 Landing for Right & Left Turn. It is included with the R242 Ramp Run or R100 Bottom ...
Attach crossbeam RC536/RC548 (Z) (sold separately) to Landing Leg Assembly (A6) with 1/4 in. x 3 in. bolt (AA) and 1/4 in. nut (BB). Add T Leg Assembly (A5) to other side of crossbeam RC536/RC548 (Z) (sold separately). NOTE: Position nut (BB) to face upward on ramp. Recommended Tool (not included): Ratchet wrench with 7/16 in. socket Hardware Used x 2 x 2 AA BB 1/4 x 3 in. Bolt 1/4 Nut Landing Right & Left Turn R342 21 ...
22. Attach Landing crossbeam (Q or R) to back of Land- ing Leg (A6) Assembly with 1/4 in. x 3 in. bolt (AA) and 1/4 in. nut (BB). Add Landing Sq. Leg (A8) Assembly to crossbeam with 3 in. bolt (AA) and nut (BB). NOTE: Crossbeam (Q) 24-1/2 in. used on ramp width 36 in. Crossbeam (R) 12-1/2 in. used on ramp width 48 in. Recommended Tool (not included): Ratchet wrench with 7/16 in. socket Hardware Used x 2 x 2 AA BB 1/4 x 3 in. Bolt 1/4 Nut NOTE: If coming from an R242 Ramp Run, use this assembly to complete steps 8-13. Then continue with step 23. 23. Attach handle (PP) to all post pinss ...
Hardware Used x 1 AA BB 1/4 x 3 in. Bolt 1/4 Nut x 2 24. Assemble corner posts. Attach Landing crossbeam (P) to Landing Sq. Leg As- sembly (A8) with 1/4 in. x 3 in. bolt (AA) and 1/4 in. nut (BB). Attach the other side of Landing Crossbeam (P) to the left side of Landing Leg (A7) Assembly for a right turn or the right side of (A7) for a left turn. Secure with a 3-1/4 in. bolt (FF) and nut (BB). Position nut (BB) inside land- ing. Recommended Tool (not included): Ratchet wrench with 7/16 in. socket 1/4 in. x 3 1/4 in.Bolt FF x 1 Hardware Used BB 1/4 Nut x 2 25. Attach crossbeam RC536/RC548 (Z) (sol ...
Space remaining three joists 12 in. to 16 in. apart. 27. Lock side rail (G) over crossbeams. Landing Right & Left Turn R342 Diagram for Left Turn Diagram for Left Turn 27 26 ...
28. If section is next to house/deck, refer to step 14. Install Threshold Kit RT536 or RT548. Pull handles (PP) and raise/lower crossbeam (Z or P) to level the entire platform. Recommended Tool (not included): Level. 29. Finish leveling all crossbeams (Z, P, Q, R) by turning the fine-adjustment set screw in each sleeve using a hex key (not included). Turn the screw clock- wise to raise the crossbeam or counterclockwise to lower it. Recommended Tools (not included): hex key, level. 28 29 ...
30. Attach Beam cover (S) to Landing crossbeam (P) with #14 x 1 in. white screws (EE). Recommended Tool (not included): drill with 3/8 in. hex nut driver Hardware Used #14 x 1 in. HWH #3 Tek Screw x 8 EE 31. Attach beam cover (T or U) to crossbeam (Q or R) with #14 x 1 in. white screws (EE). NOTE: Beam cover (T) 13-1/2 in. used on ramp width 48 in. Beam cover (U) 25-1/2 in. used on ramp width 36 in. Recommended Tool (not included): drill with 3/8 in. hex nut driver Hardware Used #14 x 1 in. HWH #3 Tek Screw x 3 EE 30 31 ...
32. Attach two beam cover brackets (V) to support joist (J) with two #14 x 1 in. screws (EE) each. Position one bracket next to T Leg Assembly (A5) and one next to support joist bracket (K). Recommended Tool (not included): drill with 3/8 in. hex nut driver Hardware Used #14 x 1 in. HWH #3 Tek Screw x 4 EE Hardware Used #14 x 1 in. HWH #3 Tek Screw x 2 EE 33. Attach remaining beam cover (T or U) to crossbeam (Q or R) with three #14 x 1 in. white screws (EE). NOTE: Beam cover (T) 13-1/2 in. used on ramp width 48 in. Beam cover (U) 25-1/2 in. used on ramp width 36 in. Recommended Tool (not included) ...
Household Appliance PDF Instructions
Device maintenance guide for the HomeMatic HM-OU-CFM-Pl Household Appliance. The documentation guides users through setup and basic operation, startup procedures, energy usage.
Brijač za odjeću ΑΠΟΧΝΟΥΔΩΤΗΣ Машинка за пилинг на облекло Aparat de cură at scame Pūkų rinkiklis Topieemaldaja Lint remover Fusselrasierer Golarka do tkanin Odžmolkovač Odžmolkovač Textilborotva Brivnik tkanin Upu Product reference manual for the Blaupunkt RLR301 Household Appliance. The manual guides users through reset instructions, configuration options, connectivity options.
QUICK INSTALLATION GUIDE EN | 简 | JP 快速安装指南 | クイック インストール ガイド Nokia Sleep Installation instructions for the Nokia Nokia Sleep Measuring Instruments. This documentation guides on replacement parts, energy usage, setup tips.
NOTE: part D has a plastic cap on one end NOTE: part E has a small, threaded hole on one end A 26 ea Sleeve B 2 ea Wheel C 2 ea Locking wheel G 2 ea Shelf H 4 ea Hanging rod bracket J 4 ea Screw K 2 ea Middle support L 1 ea Valet D 4 ea Top pole F 4 ea Threade Operation instructions for the Whitmor 6070-3366 Household Appliance. The document presents control functions, hardware instructions, software installation, technical assistance.