Cayken SCY-2550 Operating Instruction
Read Online
Read the Cayken SCY-2550 Operating Instruction online using the built-in PDF viewer.
Key Pages of Document
........................................................................................................... ....................................................................................... .......................................................................................... ..................................................................................... ....................................................................................... ...
manual. The machine only for the specialized persons, please do not let other people operate. If any violation of the instructions operation and cause personal injury or machine damage, our company disclaim all responsibility. The machine can only maintain by the people who has the certification. THANKS TO THE BUYER Great thanks for buyi ...
1.Top 2.Column 3.Rack 4.Handle 5.Cover 6.Power switch 7.The stator shell 8.The middle cover 9.Gear box 10.Shift knob 11.Water tap 12.Principal axis 13.Regulating screw 14.Base (a.ordinary b.angle adjustable ) 15.Lifting device 16.Lift handle 17.PRCD 18.Plug(a.CN b.GB c.EP d.US) ...
right to change the technical data without prior notice . TECHNICAL PARAMETER TECHNICAL CHARACTERISTIC DESCRIPTION The above series of drilling machine can only be installed on the frame to use.This machine is applicable to the trained professionals to operate, in the rock, concrete, asphalt materials s- uch as drilling or coring. If drilling diameter is morethan 250mm, you must us ...
follow the rules for safe operation. Please read carefully before operating the machine, keep this manual in a safe place. 1. Keep working place cleanb.An untidy working area will increase the risk of accidents. 2. Take ambient conditions into account.Do not expose power tools to rain.Do not use power tools near gas source. 3. Protect yourself against electric shock.A ...
for such use. 16. Always be alert,Observe your work.Proceed with care and do not use the power tool if you can't concentrate. 17. Check your machine regularly.Before using the power tool again,you must check carefully that protective devices or damaged parts are functioning correctly,that they are not sticking,that no parts are broken,that all other p ...
quickly.Max. Water pressure 3 bar. ATTENTION:Do not operate the machine if the PRCD goes wrong. Never operate a diamond core drilling machine without PRCD . STEP 3 water connection. Use the attached accessries “Quick connector”to connect the water hose to the water supply system. Step 4 Safety test After having switch on the motor starts softly.Press “TEST” butto ...
speed is too fast, please pull out the drill bit then re-feed. If the motor stop when drilling, please return on the machine and slow down the feed speed. FRICTION CLUTCH The integrated friction clutch protects operating personnel,whenthe machine and the tool against high mechanical overloads,please ensure that the release time of the clutch is not more than 3-4 seconds,otherwise wear and heat will increase rapidly. MAINS SWI ...
There are high, medium and low-grade, high speed file (H file) for small bits and soft materials; medium file (M file) for medium bit and hard materials; low profile (L profile) forDrill and hard materials. Shift when the machine stops or will stop. Shift in place. If the spindle does not rotate or there is some noise after starting up, the gear may not shift in place. Turn o ...
Check the power supply,check the plug and switch Carbon brush jammed,or escaped from the commutator Resetting the carbon brush PRCD protection works Press RESET button on the PRCD PRCD goes wrong Change PRCD Drilling slowly Drill bit worn out Change drill bit Feeding pressure too low Use greater pressure Drill bit segment were pasted by the chi ...
ATTENTION: You must remove the main plug from the supply socket before beginning any maintenance or repair work. Clean the machine with a dry or moist cheaning-rag and not with a jet of water. Make sure that no water gets into the motor or the switch box. Ensure that the ventilation slots are always clean. Clean and greases the spindle thread , too. Oil bath gear The gear oil should be changed after ...
Hose faucet 200A-EU Hegonal screw M5 * 18 Watershed 250B Spindle 250A Bearing 6202 Class II tooth shaft 250A-4(14) Marketing 4 * 16 Class II gear 250A-3 Bearing 6001 Inner card 52 Bearing 3205 Gear box 250B-1 Hand-key pad 250A Separation film 200A Spindle gear 250A-5(14) Flesh iron 2 ...
Hose faucet 200A-EU Hegonal screw M5 * 18 Watershed 250B Spindle 250A Bearing 6202 Class II gear axis 250A/2 -6(12) Ball head plunger M8 * 15 Type II High Speed Gear 250A/2 -5 Stop Ring 18 Class II sliding gear 250A/2 -4 Type II low-speed gear 25 ...
Hose faucet 200A-EU Hegonal screw M5 * 18 Watershed 250B Spindle 250A Bearing 6202 Class II tooth axis 250A/3 -6(12) Ball head plunger M8 * 15 Type II High Speed Gear 250A/3 -5 Stop Ring 18 Class II sliding gear 250A/3 -4 Type II low-speed gear 250A/3 -3 Card 16 Bearing 6001 O-ring � ...