twall Premium64 Operation & User’s Manual
Read Online
Read the twall Premium64 Operation & User’s Manual online using the built-in PDF viewer.
Key Pages of Document
mobile / stationary Interactive Sport and Training Device User Manual Rev. 1.0.3 Data CD ...
E| 3 Table of Content: Hardware documentation 1 Product description---------------------------------------------------------------------------------------- 4 1.1 Intended use ------------------------------------------------------------------------------------------------------4 2 Scope of delivery ----------------------------------------------------------------------- ...
4 |E Hardware documentation 1 Product description The twall® is an interactive sports device using light pulses to specifically initiate motion sequences. The twall consists of large, evenly arranged pads containing colour signals lit and deactivated by touch - for the training of sterical movement. Depending on the training sequence used condition, agility, the ability ...
E| 5 2 Scope of delivery 2.1 Overview - scope of delivery of the twall®Premium64 mobile A1 1 x Frame base A2 1 x Aluminium frame A3 4 x twall® Basic modules A4 4 x Weights B1 1 x Stainless steel frame cover left with bar code of the twall® B2 1 x Stainless steel frame cover right incl. control panel with power supply jack and power supply witch (connections ...
6 |E A2c 4 x Frame profiles long 45 x 45 x 1933 mm | 1.77 x 1.77 x 76.10 inch (of which one with pre-assembled PVC installation channel) A2d 2 x Frame profiles short 45 x 45 x 840 mm | 1.77 x 1.77 x 33.07 inch A2e 8 x Profile angles 28 x 28 mm | 1.10 x 1.10 inch � � �Assembling the aluminium frame – three steps: I. Mounting the frame profiles 8 x Profile con ...
E| 7 �� E User manual and data-CD 2.2 Overview - scope of delivery of the twall®Premium64 stationary A2 1 x Aluminium frame A3 4 x twall® Basic modules B1 1 x Stainless steel frame cover left with bar code of the twall® B2 1 x Stainless steel frame cover right incl. control panel with power supply jack and power supply switch (connections for further eq ...
8 |E � � Assembling the basic modules – two steps: I. Setting up the basic modules 8 x T-nuts M8 8 x Socket head screws M8x30 8 x Washers II. Connecting the basic modules to the control panel 16 x 14-stranded flat ribbon cables to connect to the manifold PCBs marked as 0.1 - 0.4, 1.1 - 1.4, 2.1 - 2.4 and 3.1 - 3.4 2 x 26-stranded flat ribbon cables to connect to ...
E| 9 3 Assembly ATTENTION: Before start-up a period of 1-2 hours is advised for the equipment to acclimatize. Please pay attention to condensation that might appear. 3.1 3.1.1 Storage space requirements In order to set up the twall® a compact and even stand space of a minimum of 3 x 3 m | 118.11 x 118.11 inch is required (fig. 3.1-1). It must carry a weight of at lea ...
10 |E 3.1.3 Assembly instructions 3.1.3.1 Assembling the frame base I. Mounting the frame base profiles: Step Please remove the packaging material. You may use this as a protective pad during assembly to avoid components being scratched or damaged. Step Before you start putting together the frame base A1 (fig. 3.1-3), please attach all the profile connectors to the ...
E| 11 Step Put the frame base in an upright position in order to attach the four (4) rubber feet to the bottom of the frame base. (fig. 3.1-7 and 3.1-8) The projecting profiles should point upwards. Push the rubber feet into the lower lead channels and position the adhesive feet at the outer lower edges of the frame base profiles A1c. II. Attaching the profile ang ...
12 |E 3.1.3.2 Assembling the aluminium frame I. Mounting the frame profiles: The aluminium profile serves as the frame of the twall®Premium64, in order to be installed freestanding. (fig. 3.1-15). Step Place the frame base A1 with the rubber feet at the lower side the way that the projecting profiles A1c are facing you (fig. 3.1-15). To ensure the twall® is firm and ...
E| 13 Step 12 Shove the shield A2b into the front lead channel between the side supports down to the long frame profile A2c. (fig. 3.1-19). � The shield (8 mm | 0.32 inch) should click exactly into the lead channel of the frame profile. Step 13 Then insert another long frame profile A2c into the front lead channel between the side supports and move it down to the sh ...
14 |E 930 mm | 36.61 inch from the inner edge of the side supports to the middle of the screws the profile angles will be screwed on with. Attach two (2) profile angles A2e to the long and the short frame profiles again (fig. 3.1-22 and fig. 3.1-23). Afterwards tighten the profile connectors of the long frame profile A2c with a corresponding Allen key (ca. 25Nm). Please pa ...
E| 15 Step 19 Place the weights A4 at the rear side of the frame base (fig. 3.1-28). Please be aware of the industrial safety regulations (20 kg | 44 lbs per weight). Step 20 Finally, put the two (2) black cover caps on the top ends of the side supports and press the four (4) grey PVC combination profiles into the outward lead channels of the side supports (above the ...
16 |E II. Connecting the basic modules to the control panel: Step 24 You can find four (4) 14-stranded flat ribbon cables at each basic module to connect them to the manifold PCBs (fig. 3.1-32 and 3.1-33). The cables are marked as 0.1 - 0.4, 1.1 - 1.4, 2.1 - 2.4 and 3.1 - 3.4 as well as the appropriate plug number. Now put the flat ribbon cables on the manifold PCBs. The P ...
E| 17 PLEASE NOTE: Please keep in mind that the correct polarity has to be considered as it is mechanically coded. Please avoid any violence. Please make sure to handle the cables very carefully. Do not pull or twist them, especially not close to the connectors. Furthermore, please use the correct cable slots of the stain- less steels frame covers to avoid that any ca ...
18 |E 3.2 Stationary installation of the twall®Premium64 3.2.1 Storage space requirements The wall the device will be assembled to must have a sufficient solidity and should be suitable to use the provided dowels. Plaster- board walls have to be covered at least twice. The safe fastening of the device should be checked on a regular basis (fig. 3.2-1 and 3.2-2). In order t ...
E| 19 fig. 3.2-6 Step 3 Insert a long frame profile A2c into the lower lead channel (towards the floor) between the side supports A2a. The ends of the frame profile and the side supports have to be on the same level and need to be flush-mounted (fig. 3.2-5). The cross pieces of the profile connectors should point upwards (towards you). Now tighten the profile connecto ...
20 |E Step 7 Insert two (2) T-nuts into the just assembled short frame profile again, this time 1 x at the top left and 1 x at the top right. Afterwards shove the long frame profile A2c with the pre-assembled PVC installation channel into the lower lead channel between the side supports, move it until it seats on the short frame profile. The PVC installation channel should ...