Shire 46034 Assembly
Text of Shire 46034 Assembly
J Shepherd 31/03/2010 I
1.Before construction of your
cabin the complete decking
rectangle is made first.
2.Equally space the deck bear-
ers with the 62mm (wide) side
to the floor and the outer bear-
ers level with the end of a deck
board (Fig D1)
Fig D1
3.Use another deck board as a
guide
24/11/2010 Julian Shepherd issue R8 A
EXAMPLE CABIN
Thank you and congratulations on the purchase of your pine lodge. We believe
that this product will give you many years of excellent service. This is a natural
product manufactured to the highest standard therefore if you have any queries
or experience any diffic
24/11/2010 Julian Shepherd issue R8 B
See Drawing pages 1&2
1.
Lay out pressure treated base floor joist timbers as fig 1(It is recom-
mended that you place a piece of damp proof strip under each joist).
2.
34 44 70 log buildings The external walls parallel to the joists have two
joists as in fig2 and need to
24/11/2010 Julian Shepherd issue R8 C
See sheets 2A, 3A
1.
Assemble the back gable first.
2.
The letters on the sheets are viewed as looking from the outside of the
building. Once gables are in place (see page 8) ensure bottom of gable
meets the top of the side panel
3.
If gable is slightly raised from the side panel
24/11/2010 Julian Shepherd issue R8 D
FIG 16
8.
Overlap this strip with the next one next with a maximum of a 100mm
overlap and nail as above and along the overlap,
9.
Repeat on both sides until you get to the ridge piece.
10.
The next piece will go over the high point of the roof and down both
sides nail along the
24/03/2010 J Shepherd I
Qty. Description Length Code
2 Door frame 25x(log size) 28 1855 DA
2 Door frame 25x (log size) 28 1421 DB
4 Door architrave 70x20mm
24/03/2010 J Shepherd II
Fig 8
12 Drill (not too deep) and screw in each corner with 40mm screws (fig 9).
Fig 9
13 With a pencil mark the screw centres on the inside long edge of the frame
to help ensure the door hinge screws will miss these screws.
14 Turn frame over and repeat steps 5 to 13 on the ot
16/11/2010 J Shepherd 1
YOU MUST READ THE SAFETY SUPPLEMENT AT
THE BEGINNING OF THE MAIN INSTRUCTION
SHEET
WINDOW KITS– Taped in sets
1 Windows W9S –TOP HUNG
2 Casement stays with 2 pins and screw sets
2 Window hinges
2 Window frame 25x29 x1196