1.Before construction of your cabin the complete decking rectangle is made first. 2.Equally space the deck bear- ers with the 62mm (wide) side to the floor and the outer bear- ers level with the end of a deck board (Fig D1) Fig D1 3.Use another deck board as a guide

24/11/2010 Julian Shepherd issue R8 A

EXAMPLE CABIN Thank you and congratulations on the purchase of your pine lodge. We believe that this product will give you many years of excellent service. This is a natural product manufactured to the highest standard therefore if you have any queries or experience any diffic

24/11/2010 Julian Shepherd issue R8 B

See Drawing pages 1&2 1. Lay out pressure treated base floor joist timbers as fig 1(It is recom- mended that you place a piece of damp proof strip under each joist). 2. 34 44 70 log buildings The external walls parallel to the joists have two joists as in fig2 and need to

24/11/2010 Julian Shepherd issue R8 C

See sheets 2A, 3A 1. Assemble the back gable first. 2. The letters on the sheets are viewed as looking from the outside of the building. Once gables are in place (see page 8) ensure bottom of gable meets the top of the side panel 3. If gable is slightly raised from the side panel

24/11/2010 Julian Shepherd issue R8 D

FIG 16 8. Overlap this strip with the next one next with a maximum of a 100mm overlap and nail as above and along the overlap, 9. Repeat on both sides until you get to the ridge piece. 10. The next piece will go over the high point of the roof and down both sides nail along the

24/03/2010 J Shepherd I

Qty. Description Length Code 2 Door frame 25x(log size) 28 1855 DA 2 Door frame 25x (log size) 28 1421 DB 4 Door architrave 70x20mm

24/03/2010 J Shepherd II

Fig 8 12 Drill (not too deep) and screw in each corner with 40mm screws (fig 9). Fig 9 13 With a pencil mark the screw centres on the inside long edge of the frame to help ensure the door hinge screws will miss these screws. 14 Turn frame over and repeat steps 5 to 13 on the ot