Waters 61164 Installation Manual
Text of the manual
Installation Guide / Guide d’installation
DISTRIBUTED BY / DISTRIBUÉ PAR
PB with diverter/ Pression équilibrée avec déviateur
#61164 / #61166 / #61168
NPT/sweat connection – PEX connection – WB connection
Raccordement NPT/soudé – Raccordement PEX – Raccordement WB
#61164
NPT/sweat c
DISTRIBUTED BY / DISTRIBUÉ PAR
CONGRATULATIONS ON THE PURCHASE OF YOUR PRODUCT
FÉLICITATIONS POUR L'ACHAT DE VOTRE PRODUIT
We recommend the installation of this product to be
done by a licensed plumber. Please take a moment to
read the following instructions and keep this document
for future reference.
We hope this product will
DISTRIBUTED BY / DISTRIBUÉ PAR
VALVE COMPONENTS
COMPOSANTS DE LA VALVE
1
3
2
SPECS AT LARGE / SCHÉMA DES PIÈCES
1- ALT76061100: Deverter/Déviateur
2- ALT760705SS: Check valve / Valve d'arrêt
3- ALT760703: Cartridge holder/ manchon de cartouche
4 ALT76010100 + ALT76010200: Extension kit (sold separately) / Kit d’extension (
DISTRIBUTED BY / DISTRIBUÉ PAR
Min.[43.00] 1 11/16”
Max.[67.00] 2 5/8”
[48.00]
1 7/8”
Min.[35.10]
1 3/8”
[43.84]
1 3/4”
[130.00]
5 1/8”
[54.00]
2 1/8”
[47.83]
1 7/8”
[140.00]
5 1/2”
GENERAL DIMENSIONS
DIMENSIONS GÉNÉRALES
BEFORE YOU START
AVANT DE COMMENCER
CAUTION: FOR BEST RESULTS, WE STRONGLY
RECOMMEND TH
DISTRIBUTED BY / DISTRIBUÉ PAR
How to Use the Plastic Protector Cap
The valve is covered by a plastic protector cap. It can be used as a
template for setting the depth of the valve in the wall. The finished
wall can fall anywhere along the side of this plastic cap (Fig.1).
The protector cap will also be used as a template to cut
DISTRIBUTED BY / DISTRIBUÉ PAR
Installing the valve
Once the mixer location is determined, position the
valve in between 2x4 studs inside the wall on a plywood
backing for better support. (Fig. 3)
Make sure the valve is level and at the right
depth before securing it firmly in place.
Intallation de la valve
Une fois l'emplacemen
DISTRIBUTED BY / DISTRIBUÉ PAR
(A)
(B)
UP
DOWN
COLD WATER
EAU FROIDE
HOT WATER
EAU CHAUDE
Connecting the water
Connect the hot and cold water inlets and the mixed water
outlets (Fig. 5). The hot water must always be connected on
the left side and the cold water on the right, as indicated
on the valve body. Ensure the piping is fr
DISTRIBUTED BY / DISTRIBUÉ PAR
1
4
6
3
2
5
The highest temperature needs to be set at or under 120°F (49°C).
It can be adjusted as follows: remove the decorative cap (1), the set
screw (2), the handle (3) and the dome cap (4) (Fig. 6). Pull out the
temperature limiting ring (5) from the cartridge (6). Gradually rotate
it to the