FLEXY II FLEXYII-IOM-0409-E Installation, operating and maintenance ...
FCM 85 - FCM 100 - FCM 120 - FCM 150 - FCM 170 - FCM 200 - FCM 230 FHM 85 - FHM 100 - FHM 120 - FHM 150 - FHM 170 - FHM 200 - FHM 230 FDM 85 - FDM 100 - FDM 120 - FDM 150 - FDM 170 - FDM 200 - FDM 230 FGM 85 - FGM 100 - FGM 120 - FGM 150 - FGM 170 - FGM 200 - FGM 230 FXK 25 - FXK 30 - FXK 35 - FXK 40 - FX ...
Dimensions and weights........................................................................................ ...
Diagram reference legend ..............................................................................................................................69 Main current diagram TRI/400V/50Hz + T……………………………………………………...............................70 CLIMATIC 50 controller…………………………………………………………………………...... ...
The following note must be followed carefully All work on the unit must be carried out by a qualified and authorised employee. Non-compliance with the following instructions may result in injury or serious accidents. Work on the unit: • The unit shall be isolated from the electrical supply by disconnection and locking using the main isolating switch. • Workers sh ...
- The UV lamp emits shortwave UV-C ultraviolet radiation which is harmful to skin and eyes - It can cause serious skin burns and eye inflammation within ONE SECOND of exposure - Do not enter the machine while UV are switched on - Make sure the UV light circuit breaker is OFF when opening the return air section door and the supply air section doors - The following logo will appear to inform about the UV-C radiation ...
Sufficient Access OK Yes No ...
Outdoor Fan Motor Current: Check Rotation Motor 1 / Moteur 1 L1 ……..A L2 ……..A L3 ……A Yes No Motor 2 / Moteur 2 L1 ……..A L2 ……..A L3 ……A Yes No Compressor Voltage Motor 3 / Moteur 3 L1 ……..A L2 ……..A L3 ……A Yes No Comp1: …….. V Motor 4 / Moteur 4 L1 ……..A L2 ……..A L3 ……A Yes No Comp2: …….. V Motor 5 / Moteur 5 L1 ……..A L2 …… ...
Refer to control section page 55 / Se référer à la section régulation page 55 Time Zones / Zones Horaires Hour 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Example UNO 7h15 ZA 11h00 ZB 14h00 ZC 19h00 UNO Monday Tuesday Wednesday Thursday Friday Saturday Sunday Variables to adjust for each ...
FLEXYII-IOM-0409-E Page 9 COMMENTS:…………………………………………………………………………………………………………………………………… ………………………….……………………………………………………………………………………………………………………… ……... ……………………….…………………………………………………………… ...
points. It is the customer’s responsibility to ensure that the products are in good working order: - The exterior has not been damaged in any way. - The lifting and handling equipment are suitable for the equipment and comply with the specifications of the handling instructions enclosed here-in. - Accessories ordered for on site installation have been del ...
Handling slings to guide the unit towards the roofcurb Vacuum lifting beam to position the unit COMPLIANT NON-COMPLIANT MANDATORY HANDLING DEVICES ...
FLEXY2 FCM/FHM/FGM/FDM 85 100 120 150 170 200 230 View (F, G, H box) F BOX F BOX F BOX G BOX G BOX H BOX H BOX A mm 2200 2200 2200 2200 2200 2200 2200 B mm 3350 3350 3350 4380 4380 5533 5533 C mm 1510 1510 1510 1834 1834 2134 2134 D mm 360 360 360 450 450 615 615 Weight of standard units FCM Without economiser kg 933.8 1008.8 1085.0 1367.0 1430.0 1650.0 1950.0 With economiser kg 990.3 1065. ...
LENGTH HEIGHT WIDTH HOOD WEIGHT Side Fan Standard mm mm mm mm mm kg FXK025 4070 1635 1055 490 600 950 FXK030 4070 1635 1055 490 600 980 FXK035 4750 2255 1290 490 600 1400 FXK040 4750 2255 1290 490 600 1450 FXK055 4750 2255 1290 490 600 1600 FXK070 5050 2255 1725 890 600 1800 FXK085 5050 2255 1725 890 600 1900 FXK100 5050 2255 1725 890 600 2000 FXK110 5650 2255 2000 860 - 2620 FXK140 5650 2255 2000 860 - 2 ...
As shown on the picture below, a lifting frame is necessary. After lifting, withdraw angle’s feet and lifting lugs. TRANSPORT – HANDLING ...
REMOVE THE FORKLIFT PROTECTIONS BEFORE INSTALLATION PRELIMINARY CHECKS Before installing the equipment, the following points MUST be checked: - Have the forklift protections been removed? - Is there sufficient space for the equipment? - Is the surface on which the equipment is to be installed sufficiently solid to withstand its weight? A detailed study of the f ...
Figure 4 shows the required clearances and service access around the unit. NOTE: Ensure the fresh air inlet does not face prevailing wind direction. A B C D FCM/FHM/FGM/FDM F BOX 2200 (1) 2000 2000 2000 G BOX 2700 (1) 2000 2000 2000 H BOX 2700 (1) 2000 2000 2000 FX 25 & 30 * 1100 * 1700 35Æ55 * 1300 * 2300 70Æ100 * 1700 * 2300 110Æ170 * 2000 * 2300 (1) Add 1 meter if the units are equipped wit ...
necessary to reach the main switch. This recommendation is valid for installations in general and in particular for return and curbs. It’s also valid to reach other parts of the unit: filters, refrigerant circuit, etc… - It’s recommended to fix curbs and roofcurbs to the unit using cables to link the lifting lugs together. ...
30mm every 200mm ) along the outside or by using an alternative method CURBING AND FLASHING Outside of frame must be insulated with rigid type insulation; We recommend a minimum of 20 mm thick insulation (2-figure 7). Check that the insulation is continuous, counter flash and seal around the fr ...
change. These recommendations are imperative in the case of 2 independent turbines (sizes from 150kW to 230kW and all units equipped with gas module) Horizontal supply Vertical supply Here are obvious bad examples of ducts connections noted on site: D ≥ 2m DUCT CONNECTIONS INSTALLATION ON A ROOFMOUNTING FR ...