Halstead BFF80 Instructions For Use Installation And Servicing
Text of the manual
Balanced Fanned Flue Boiler
This is a Cat I2H Appliance
Reference in these instructions to British Standards and Statutory
Regulations/Requirements apply only to the United Kingdom.
For Ireland the rules in force must be used.
The instructions consist of three parts, User, Installation and Servicing Instructions, which includes the Guarant
TESTING AND CERTIFICATION
This boiler is tested and certificated for safety and performance. It is therefore important that no alteration is made to the boiler, without
permission, in writing, from Halstead Boilers Ltd.
Any alteration not approved by Halstead Boilers Ltd., could invalidate the certification, boiler warranty and may also infringe
Instructions for Use
Introduction
Please read these instructions and follow them carefully for the
safe and economical use of your boiler.
The Halstead Buckingham 4 B FF series are balanced fanned
flue boilers. They provide heating and if required, an indirect
domestic hot water supply.
The boiler is automatic in operation, having only one user
co
To Turn the Appliance On
Turn the electrical supply on to the boiler and check that all
remote controls are calling for heat.
Turn the boiler temperature control clockwise to any position
between “0” and "Max", see diagram 1.
"Max" is approximately 82°C (180°F).
The boiler lighting operation is now automatic as follows:
The fan operates and a
1 General Data
Important Notice
This boiler is for use only on G20 gas.
The boiler is delivered in one pack and the flue pack is supplied
separately.
Wherever possible, all materials, appliances and components to
be used shall comply with the requirements of applicable British
Standards.
Where no British Standard exists, materials and equipment
sho
1.3 Statutory Requirements
The installation of this appliance must be carried out by a
competent person and must be in accordance with the relevant
requirements of the current issue of:
Manufacturer’s instructions supplied.
The Gas Safety (Installation and Use) Regulations, Building
Regulations, Local Water Company Bye-laws, The Building
Standar
1 General Data
1.7 Boiler Location
This boiler is not suitable for outside installation.
The boiler casing can be fitted at two heights. Refer to
diagram 1.3.
The boiler is assembled at the factory with the control box and
heat shield fitted in the lower position.
The boiler must stand on a level floor, conforming with local
authority requirements
FULLY PUMPED SYSTEM
(DIAGRAMMATIC)
2 Water Systems
0870
1 metre
MIN.
27metres
MAX.
PUMP
Heating
Circuit
TO INDIRECT
CYLINDER
22mm VENT
15mm
COLD FEED
Distributor tube in
pumped return
connection
BOILER
CL
DRAIN OFF
COCK
2.1 Water Pressure Head
The boiler shall only be connected to a cistern water supply with
a minimum head of 1met
3 Flue and Ventilation
FROM
OUTSIDE
COMPARTMENT AIR VENT TABLE
COMPARTMENT
VENTILATION
REQUIREMENTS
VENTILATION
FROM ROOM
OR SPACE
HIGH LEVEL
LOW LEVEL
VENT AREA
VENT AREA
The flue must be installed in accordance with the rules in force
in the countries of destination.
3.1 Terminal Position
The minimum acceptable siting dimensions for the terminal
General Installation Notes
The appliance pack contains :-
Boiler
Fan connector
Casing panels, packed seperately.
Loose items fittings pack, see list in pack.
The flue is supplied seperately.
NOTE: The rear flue option kit Part No. 425861 is available,
which consists of wall cover plates, for replacement Buckingham
balanced flue