1
WARNING: Hazard of electrical shock or burn. Turn off
power supplying this equipment before working inside
General
To
comply
with the
National Electrical Code and
Underwriters Laboratories, the breaker retainer kit and
service barrier must be installed in accordance with the
information contained in this sheet and by a qualified
electrical contractor and/or licensed electrician.
Introduction
This bulle
© 2016 General Electric All Rights Reserved 2
Figure 2: Install Retainer to secure breaker
See figure 3, load center fully assembled with kit
Figure 3: shows Kit fully assembled
5.
Remove the backing from the enclosed "SERVICE
DISCONNECT" label and attach it to the dead
front/shield besides the main circuit breaker opening.
WARNING: Service barriers (A) must be correctly
installed on the line side of a main device in GE load
centers,