GE PowerMark Gold Installation Instructions

Text of GE PowerMark Gold Installation Instructions

© 2016 General Electric All Rights Reserved

1 WARNING: Hazard of electrical shock or burn. Turn off power supplying this equipment before working inside General To comply with the National Electrical Code and Underwriters Laboratories, the breaker retainer kit and service barrier must be installed in accordance with the information contained in this sheet and by a qualified electrical contractor and/or licensed electrician. Introduction This bulle
© 2016 General Electric All Rights Reserved 2 Figure 2: Install Retainer to secure breaker See figure 3, load center fully assembled with kit Figure 3: shows Kit fully assembled 5. Remove the backing from the enclosed "SERVICE DISCONNECT" label and attach it to the dead front/shield besides the main circuit breaker opening. WARNING: Service barriers (A) must be correctly installed on the line side of a main device in GE load centers,