Anchor NAV50-1204 Operation & User’s Manual
Text of Anchor NAV50-1204 Operation & User’s Manual
50’ Wide System
Quality, Craftsmanship and Service since 1892
NAV50-1204
Copyright © Anchor Industries 2004
Please read all assembly / installation instructions before the installation or removal of this product.
1100 Burch Dr., Evansville, IN 47725
Ph. 812-867-2421 • Fax. 812-867-0547
E-mail: [email protected] • www.anchorinc.com
Navi-Trac
ANCHOR
TABLE OF CONTENTS
Page No.
Assembly Step
2
Squaring Footprint and Laying out Uprights
3
50’ NAVI-TRAC component list and Hardware Location Chart
4
Introduction
5
50’ NAVI-TRAC Component Illustrations
6
NAVI-TRAC Installation Safety Guidelines
7
Construct End Module Top Frame
9
Install Hip End Fabric
10
Installing Uprights Under the Top Frame
11
Ten
DIRECTIONS FOR SQUARING THE TENT
1. USE A TAPE MEASURE TO MARK THE ENDS OF A LINE FOR ONE END (A TO B ABOVE)
EQUAL TO THE EXACT WIDTH OF THE UNIT.
2. HOLD THE “0” END OF ONE TAPE AT POINT “A” AND THE “0” END OF ANOTHER TAPE
AT POINT “B”.
3. EXTEND THE FIRST TAPE ALONG ONE SIDE OF THE UNIT TO A MEASUREMENT
EQUAL TO THE EXACT LENGTH OF TH
50’ Navi-Trac Frame Terminology
INTRODUCTION:
The NAVI-TRAC frame configuration is based on
the hip roofed square tent shown at right.
Hip bars connect corners to the peak, and rafters
connect eave bars to the peak. The square can
be extended into a rectangle by adding 10’, 15’
or 20’ bays made up of rafters and the appropri-
ate ridge/eave bars (