Animo CB 5 Operation & User’s Manual
Read Online
Read the Animo CB 5 Operation & User’s Manual online using the built-in PDF viewer.
CB 5 Operation & User’s Manual: Key Pages of Document
/i Containers gebruiksaanwijzing betjeningsvejledning user manual bruksanvisning betriebsanleitung användarmanual mode d’emploi käyttöohjekirja ...
No part of this document may be reproduced and/or made public in print, microfilm, electronic media or any other form without the manufacturer’s prior consent. This also applies to the corresponding diagrams and/or charts. Animo retains the right to alter parts at any given time without prior or immediate announcement to the consumer. The content of this manual can also be changed without any prior warning. This manual is valid for the standard model of the device. Animo can therefore not be held liable for possible damage resulting from specifications deviating from the standard model for the d ...
Copyright ................................................................................................................................. 45 1 Safety ........................................................................................................................................ 47 1.1 Important information ....................................................................................................... 47 1.2 Warning signs ................................................................................................................... 47 1.3 Intended use ......................... ...
information about installation, operation and maintenance of the equipment. Make sure to read and understand the manual before use. It is your responsibility to operate this machine in accordance with all the safety instructions and procedures in this manual, and with all other safety procedures in your workplace. It is the user's responsibility to make sure that the machine is correctly installed, configured, commissioned, operated, serviced and maintained and that such actions ...
1.3 Intended use The machine holds and dispenses beverages. Any other or additional use will be considered to be not in conformity with the intended use. The manufacturer cannot be held liable for any damages caused by use for any other purposes than what is described above or by incorrect operation. 1.4 Modifications Animo is always willing to discuss improving the value of its machines to users by means of modifications or alterations. Refer to 1.11. WARNING ‘Warning' identifies a hazard that could lead to personal injury, including death. Caution 'Caution' identifies a hazard th ...
A splash protection is installed above the electrical connection on the container. The splash protector prevents water from entering the socket during cleaning operations. 1.6 Safety precautions 1.6.1 General safety precautions • Make sure that the environment around the machine is dry, clean and lit sufficiently well. • Only persons that have specific knowledge and practical experience with the machine, particularly in regard to safety and hygiene, should be permitted into the service area where the beverage(s) are prepared. • Keep away from moving parts. � ...
• Descale the elements regularly. 1.6.5 Electrical connection • If the power cable is damaged: - If the machine has a separate, detachable power cable, replace the damaged power cable with a new supply cable. Only use an Animo replacement part. Refer to 2.3.6 1.7 Users 1.7.1 Personnel qualifications • The machine is designed only for personnel being 8 years or older. Consider the respective national regulations for occupational safety and health. • The machine must not be operated by children or persons with reduced physi ...
/i /i 1.9 Guarantee The guarantee provisions that apply to this machine are part of the general terms of delivery. 1.10 Disposal The use and maintenance of the machine includes no environmental dangers. Most parts can be disposed in the regular way. 1.11 Further help and information Animo is committed to provide the highest level of support to users and operators of its products. Contact the dealer for information regarding settings, maintenance and repair work, which is not included in this document. EMC directive: 2014/30/EC Low voltage directive: 201 ...
B: Basket filter C: Insulated lid D: Blender - transport disk E: Integrated gauge glass A B C D E F G H I K J L ...
H: Filling pipe (brewing tea application) I: Tea filter with disk (brewing tea application) J: Handle K: Container L: Electrical socket with splash protector (CNe) 2.2 Working principle 2.2.1 Coffee blender and basket filter The basket filter (A), a paper filter, and a pre-loaded coffee product receive the hot water. The filtered coffee then flows through the coffee blender (B) into the container. 2.2.2 Tea filling pipe and filter unit The tea filling pipe and filter unit (A) receive the hot water and combine it with a pre-loaded tea product inside the container. A B A ...
the beverage. The CNe model container has an electric element (B) to keep the beverage heated. 2.2.4 Electric socket (CNe) The container model CNe is connected to the electric socket with an electric cable which is plugged into the container (B) and the socket (A). A C B A B ...
/i 2.3.2 Containers /i /i /i 2.3.3 Electrical system /i CB 5 (liter) CB 10 (liter) CB 20 (liter) Type / description Model name / Model number Model name / Model number Model name / Model number Electric heating CN 5e 1005364 CN 10e 1005365 CN 20e 1005366 Insulated CN 5i 1005998 CN 10i 1005999 CN 20i 1006000 Model CN 5 CN 10 CN 20 Contents 5 ltr 10 ltr 20 ltr Contents Maximum 5.5 ltr 11 ltr 22 ltr Tap outflow height 120 mm 120 mm 120 mm Diameter in mm 237 mm 307 mm 355 mm Height inc. lid 406 mm 427 mm 515 mm Height inc. filter 526 mm 625 mm 719 mm Model CN 5e CN ...
B: Article number C: Supply voltage [V] D: Machine number E: Water pressure [MPa] F: Power [W] G: Frequency [Hz] 2.3.6 Consumer articles and accessories Order these items from your dealer. /i Temperature 0 °C < T < 40 °C Relative humidity 80% ............ ...~.......V ..........Hz .........W ................ ............MPA Made in The Netherlands Dr. A.F. Philipsweg 47 • NL-9403 AD Assen • www.animo.eu P/N XXXXXXXX S/N Water pressure A D B C E F G Item Description Item number Coffee fur remover per box (100) sachets of 10 gm) 49009 per can of 1 kg ...
101/317 - container CN5 01115 152/457 - container CN10 01116 203/533 - container CN20 01117 Tea filter with disk Container CN5 57003 Container CN10 57005 Container CN20 57011 Filling pipe Container CN5 17018 Container CN10 17019 Container CN20 17020 S-swivel arm With "Click" connection to use with the drip-free ComBi-line tap 99497 Container tube 99499 Gauge glass brush 08094 Cable + plug 1.5 m 03072 Cable + PLUG 0.6 M 03071 Item Description Item number ...
3.1 Transport 3.1.1 Inspection after transport • Check the machine for damage. • Make sure that all the required consumer articles and accessories are present and in good order. Refer to 3.2.1 3.1.2 Preparation for transport 1 Disconnect the container from the socket. 2 Drain the container. Use the tap. 3.2 Installation Note This procedure only prepares the machine for upright transportation to another local position. Caution • Disconnect the machine from the mains power outlet. WARNING Beware of burn injuries from hot fluids. Hot beverage and water may come out from the container ...
2 Make sure you have a complete set of undamaged components and accessories. 3 Contact your dealer if any items are damaged or missing. 4 Contact a qualified electrician to connect a plug to the power cable. Refer to 1.6.5. 5 Contact a service engineer to do the first-time installation and all the required connections. Cartons and accessories Contents CNe CNi Basket filter carton 1 1 Synthetic filter Water distributor lid Basket filter papers (approximately 25 pieces) Container carton 1 1 Container CNe 1 Container CNi 1 Insulated lid ...
4.1.1 Preparation 1 Make sure that the machine is properly installed. Refer to 3.2 2 Make sure the machine and the accessories are in good condition. If the machine or accessories are in poor condition, contact a service engineer. 3 Make sure that the inner pot of the container is clean. Refer to 5.2.4 4.1.2 Prepare CNe electrical container for use 1 Put the cable with inlet plug into the back of the container and insert the plug into the socket. 2 Pre-heat the container by filling it with approximatly 2 liters of hot water for at least 10 minutes before the brew starts. 4.1.3 Prepar ...
1 Put the recommended coffee dosage (A) into the filter paper inside the container. 2 Spread the coffee evenly in the filter paper. 3 Put the filter lid with water distributor (B) onto the basket filter. 4 Direct the hot water into the distributor lid. 4.5 Brew the tea 1 Put the recommended tea dosage (A) into the tea filter in the container. 2 Put the filling pipe (B) onto the tea filter. 3 Direct the hot water into the filling pipe. 4.6 Put a cold beverage into the container 1 Fill the container with ice cubes to pre-cool the container. 2 Fill the container with cold drink. 3 Remove the ice cu ...
1 Wait for the machine to make 1 short beep sound. 2 Do a check that the progress bar (A) on the display shows that the brew is Dripping. 3 After approximately 5 minutes, wait for the machine to make 3 short beep sounds. Note • If you have a CB model with a second container, you can start a new brewing process while the first container completes the brewing process. When the water supply stops coming out of the swivel arm over the first container, put the swivel arm over the second container and start the brewing process again. • The container heating begins when the brew ...
5 Take the water distributor (C) off the basket filter (D). 6 Take the basket filter off the container. 7 Put the insulated lid (E) onto the container. 8 Dispose of the filter and the contents of the filter, and clean the filter basket. Refer to 5.2.5 9 Serve the coffee as required. Use the tap (A). 10 Drain the container of any remaining coffee after 1 to 1.5 hours. Use the tap. 11 If the container has an electric element, disconnect the power cable from the sockets on the container and the tower. 12 Rinse the inner pot of the container before you start anothe ...
Brewing Systems PDF Instructions
Model:CB1-0-01 CUBO INSTRUCTION MANUAL Read this instruction manual carefully before operating this machine!
Therminator TM Operation, Assembly & Maintenance Manual Congratulations on your purchase and thank you for selecting the TherminatorTM brand stainless steel wort chiller from Blichmann Engineering. We are confident that it will provide you years of service and
Page 1 © Ss Brewtech 2017 Keg WaSsher