SolarEdge SE50K Installation Manual
Text of the manual
For Europe, APAC,& South Africa
Version 1.0
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
1
Support and Contact Information
If you have technical problems concerning SolarEdge products, please contact us:
Country
Phone
E-Mail
Australia (+61)
1800 465 567
[email protected]
APAC (Asia Pacific)(+972)
073 240 3118
[email protected]
Benelux
NL (+31): 0800-7105
BE (+32): 0800-76633
[email protected]
[email protected]
China (+86)
21 6212 5536
[email protected]
DACH & Rest of Europe (+49)
089 454 59730
[email protected]
France (+33)
0800 917410
[email protected]
Italy (+39)
0422 053700
[email protected]
Japan (+81)
03 6262 1223
[email protected]
New Zealand (+64)
0800 144 875
[email protected]
US & Canada (+1)
510 498 3200
[email protected]
United Kingdom (+44)
0800 028 1183
[email protected]
Greece (+49)
89 454 59730
[email protected]
Israel (+972)
073 240 3122
Middle East & Africa (+972)
073 240 3118
South Africa (+27)
0800 982 659
Turkey (+90)
216 706 1929
Worldwide (+972)
073 240 3118
Before contact, make sure to have the following information at hand:
l
Model and serial number of the product in question.
l
The error indicated on the SolarEdge Inverter SetApp mobile applicationscreen or on the SolarEdge
monitoring platform or by the LED, if there is such an indication.
l
System configuration information, including the type and number of modules connected and the
number and length of strings.
l
The communication method to the SolarEdge server, if the site is connected.
l
The inverter software version as appears in the ID status screen.
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
2
Support andContact Information
Support and Contact Information
2
HANDLING AND SAFETY INSTRUCTIONS
7
Safety Symbols Information
7
IMPORTANT INVERTER SAFETY INSTRUCTIONS
7
Chapter 1: Introducing the SolarEdge Power Harvesting System
9
SolarEdge Power Optimizer
9
Extended Power Commercial Inverter
10
SolarEdge Monitoring Platform
11
Installation Procedure
11
Installation Equipment List
11
Chapter 2: Installing the Power Optimizers
13
Safety
13
Installation Guidelines
13
Step 1: Mounting the Power Optimizers
14
Step 2: Connecting a PV Module to a Power Optimizer
15
Step 3: Connecting Power Optimizers in Strings
15
Step 4: Verifying Proper Power Optimizer Connection
17
Chapter 3: Installing the Primary and Secondary Unit(s)
18
Primary Unit Package Contents
18
Secondary Unit Package Contents
18
Identifying the Units
18
Primary Unit Interface
18
Connection Unit Interface
21
Secondary Unit Interface
22
Mounting and Connecting the Primary and Secondary Unit(s)
23
Chapter 4: Connecting the AC and Strings to the Connection Unit
28
Grid Connection Guidelines
28
Connecting the AC Grid to the Connection Unit
28
Connecting the AC Grid and Grounding to the Connection Unit
29
Grounding
29
Secondary Grounding
30
Connecting the Strings to the Connection Unit
31
Selecting a Residual Current Device (RCD)
33
Chapter 5: Activating, Commissioning and Configuring the System Using SolarEdge Inverter
SetApp
34
Step 1: Activating the Installation
34
Step 2: Commissioning and Configuring the Installation
35
Setting Country and Language
36
Pairing
36
Communication
38
Power Control
40
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
3
Chapter 6: Setting Up Communication
52
Communication Options
53
Ethernet
53
RS485
53
Wi-Fi
53
GSM
53
Communication Connectors
54
Communication Board
55
Primary Unit Communication Board
55
Connection Unit Communication Board
56
Removing the Connection Unit Cover
56
Creating an Ethernet (LAN) Connection
56
Creating an RS485 Bus Connection
61
RS485 Bus Configuration
64
Verifying the Connection
65
Appendix A: Errors and Troubleshooting
67
Identifying Errors
67
Power Optimizer Troubleshooting
70
Troubleshooting Communication
71
Troubleshooting Ethernet (LAN) Communication
71
Troubleshooting RS485 Communication
71
Additional Troubleshooting
71
Appendix B: Mechanical Specifications
73
Primary Unit and Connection Unit
73
Secondary Unit
73
Appendix C: SafeDC™
74
Appendix D: External Fan Maintenance and Replacement
75
Fan Maintenance
75
External Fan Replacement
75
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
4
Appendix E: Replacing System Components
77
Replacing the Primary Unit
77
Replacing a Secondary Unit
78
Replacing the Connection Unit
78
Removing the Connection Unit
78
Installing a New Connection Unit
79
Connecting the Connection Unit to the Primary Unit
79
Replacing Power Optimizers
80
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
5
Technical Specifications .................................................................................................................82
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
6
HANDLING AND SAFETY INSTRUCTIONS
During installation, testing and inspection, adherence to all the handling and safety instructions is
mandatory. Failure to do so may result in injury or loss of life and damage to the equipment.
Safety Symbols Information
The following safety symbols are used in this document. Familiarize yourself with the symbols and their
meaning before installing or operating the system.
WARNING!
Denotes a hazard. It calls attention to a procedure that, if not correctly performed or adhered to, could
result in injury or loss of life. Do not proceed beyond a warning note until the indicated conditions
are fully understood and met.
CAUTION!
Denotes a hazard. It calls attention to a procedure that, if not correctly performed or adhered to, could
result in damage or destruction of the product. Do not proceed beyond a caution sign until the
indicated conditions are fully understood and met.
NOTE
Denotes additional information about the current subject.
IMPORTANT SAFETY FEATURE
Denotes information about safety issues.
Disposal requirements under the Waste Electrical and Electronic Equipment (WEEE) regulations:
NOTE
Discard this product according to local regulations or send it back to SolarEdge.
IMPORTANT INVERTER SAFETY INSTRUCTIONS
SAVE THESE INSTRUCTIONS
WARNING!
The inverter cover must be opened only after shutting off the inverter ON/OFF switch located at the
bottom of the Primary Unit, above the Connection Unit. This disables the DC voltage inside the inverter
and opens the AC relays. Wait five minutes before opening the cover. Otherwise, there is a risk of
electric shock from energy stored in the capacitors.
WARNING
Before operating the inverter, ensure that the inverter is grounded properly.
WARNING!
Opening the inverter and repairing or testing under power must be performed only by qualified service
personnel familiar with this inverter.
HANDLING AND SAFETY INSTRUCTIONS
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
7
Do not touch the PV panels or any rail system connected when the inverter switch is ON, unless
grounded.
WARNING!
SafeDC complies with IEC60947-3 when installing the system with a worst case SafeDC voltage (under
fault conditions) < 120V.
The worst case voltage is defined as: Voc,max+ (String Length-1)*1V,where:
l
Voc,max = Maximum Voc (at lowest temperature) of the PV module in the string (for a string with
multiple module models, use the max value)
l
String Length = number of power optimizers in the string
CAUTION!
This unit must be operated according to the technical specification datasheet provided with the unit.
CAUTION!
HEAVY OBJECT. To avoid muscle strain or back injury, use proper lifting techniques, and if required - a
lifting aid.
NOTE
Use PV modules rated according to IEC 61730 class A.
NOTE
The symbol
appears at grounding points on the SolarEdge equipment. This symbol is also used in
this manual.
NOTE
A SolarEdge inverter may be installed in a site with a generator, however must not operate at the same
time as the generator. Operating an inverter and a generator simultaneously will void the warranty.
SolarEdge requires installing a physical or electronic interlock, which will prevent the generator and
inverter from operating simultaneously. Interlock procurement, installation, maintenance and support
are the responsibility of the installer. Damage to the inverter due to incorrect interlock installation or use
of an interlock that is incompatible with the SolarEdge system will render the SolarEdge warranty
invalid.
NOTE
The following warning symbols appear on the inverter warning label:
Risk of electric shock
Risk of electric shock from energy stored in the capacitor. Do not remove cover
until 5 minutes after disconnecting all sources of supply.
Hot surface – To reduce the risk of burns, do not touch.
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
8
IMPORTANT INVERTER SAFETY INSTRUCTIONS
Chapter 1: Introducing the SolarEdge Power
Harvesting System
The SolarEdge power harvesting solution is designed to maximize the power output from any type of
solar Photovoltaic (PV) installation while reducing the average cost per watt. The following sections
describe each of the system’s components.
Figure 1: The SolarEdge power harvesting system components
SolarEdge Power Optimizer
The SolarEdge power optimizers are DC-DC converters connected to PV modules in order to maximize
power harvesting by performing independent Maximum Power Point Tracking (MPPT) at the module
level.
The power optimizers regulate the string voltage at a constant level, regardless of string length and
environmental conditions.
The power optimizers include a safety voltage function that automatically reduces the output of each
power optimizer to 1 Vdc in the following cases:
l
During fault conditions
l
The power optimizers are disconnected from the inverter
l
The inverter ON/OFF switch is turned OFF
l
The safety switch on the Connection Unit is turned OFF
l
The inverter AC breaker is turned OFF
Each power optimizer also transmits module performance data over the DC power line to the inverter.
Two types of power optimizers are available:
l
Module Add-on power optimizer – connected to one or more modules
l
Smart modules - the power optimizer is embedded into a module
Chapter 1: Introducingthe SolarEdge Power HarvestingSystem
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
9
Extended Power Commercial Inverter
The extended power commercial inverter (referred to as 'inverter' in this manual ) efficiently converts DC
power from the modules into AC power that can be fed into the main AC service of the site and from
there to the grid. The inverter also receives the monitoring data from each power optimizer and
transmits it to the SolarEdge monitoring platform (requires Internet or Cellular connection).
The inverter is comprised of one Primary Unit with an integrated Connection Unit with a DC Safety
Switch (referred to as 'Connection Unit ' in this manual) for disconnecting the DC power of a SolarEdge
system, and of one or two Secondary Units, depending on the inverter's capacity. The Secondary Unit(s)
are connected to the primary unit with AC, DC and communication cables.
Each unit operates independently and continues to work in case the others are not operating.
You can set up a master- slave configuration, connecting up to 31 additional inverters to one master
inverter.
Figure 2: Primary Unit with two Secondary Units
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
10
ExtendedPower CommercialInverter
SolarEdge Monitoring Platform
The SolarEdge monitoring platform enables monitoring the technical and financial performance of one or
more SolarEdge sites. It provides past and present information on the system performance both at the
system and module levels.
Installation Procedure
The following is the procedure for installing and setting up a new SolarEdge site. Many of these also apply
to modification of an existing site.
1. Installing the Power Optimizers, page 13
2. Mounting and Connecting the Primary and Secondary Unit(s), page 23
NOTE
It is recommended to connect communication connections (step 6 of this installation) before
connecting the AC, for easier access to the communication board.
3. Connecting the AC and the Strings to the Connection Unit,page 28
4. Activating and Commissioning the System Using SetApp, page 34
5. Configuring the System Using SetApp ,page 38
6. Setting Up Communication page 52
Installation Equipment List
Standard tools can be used during the installation of the SolarEdge system. The following is a
recommendation of the equipment needed for installation:
l
Allen screwdriver for 5mm screw type for the inverter cover,Connection Unit cover, and inverter side
screws
l
Allen screwdriver for M5/M6/M8 screw types
l
17/32 HEX Allen screwdriver for AC stud connector
l
SolarEdge supplied level
l
Standard flat-head screwdrivers set
l
Non-contact voltage detector
l
Cordless drill or screwdriver and bits suitable for the surface on which the inverter will be installed.
Use of an impact driver is not recommended.
l
Appropriate mounting hardware (for example: stainless bolts, nuts, and washers) for attaching:
o
the Primary and Secondary Unit(s) mounting brackets to the mounting surface
o
the power optimizers to the racking (not required for smart modules)
l
MC4 crimper
l
4xM8 ring terminals and a suitable crimper
l
Wire cutters
l
Wire strippers
l
Voltmeter
For installing the communication options, you may also need the following:
l
For Ethernet:
o
CAT5/6 twisted pair Ethernet cable with RJ45 connector
o
If using a CAT5/6 cable spool: RJ45 plug and RJ45 crimper
Chapter 1: Introducingthe SolarEdge Power HarvestingSystem
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
11
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
12
InstallationEquipment List
Chapter 2: Installing the Power Optimizers
Safety
The following notes and warnings apply when installing the SolarEdge power optimizers. Some of the
following may not be applicable to smart modules:
WARNING!
When modifying an existing installation, turn OFF the inverter ON/OFF switch, the Connection Unit and
the AC circuit breaker on the main AC distribution panel.
WARNING!
Input and output connectors are not watertight until mated. Open connectors should be mated to each
other or plugged with appropriate watertight caps.
CAUTION!
Power optimizers are IP68/NEMA6P rated. Choose a mounting location where optimizers will not be
submerged in water.
CAUTION!
This unit must be operated according to the operating specifications provided with the unit.
CAUTION!
Cutting the power optimizer input or output cable connector is prohibited and will void the warranty.
CAUTION!
All PV modules must be connected to a power optimizer.
CAUTION!
If you intend to mount the optimizers directly to the module or module frame, first consult the module
manufacturer for guidance regarding the mounting location and the impact, if any, on module warranty.
Drilling holes in the module frame should be done according to the module manufacturer instructions.
CAUTION!
Installing a SolarEdge system without ensuring compatibility of the module connectors with the
optimizer connectors may be unsafe and could cause functionality problems such as ground faults,
resulting in inverter shut down. To ensure mechanical compatibility of the SolarEdge optimizers’
connectors with the PV modules’ connectors to which they are connected, use identical connectors
from the same manufacturer and of the same type on both the power optimizers and on the PV modules.
IMPORTANT SAFETY FEATURE
Modules with SolarEdge power optimizers are safe. They carry only a low safety voltage before the
inverter is turned ON. As long as the power optimizers are not connected to the inverter or the inverter is
turned OFF, each power optimizer will output a safe voltage of 1V.
Installation Guidelines
l
Frame-mounted power optimizers are mounted directly on the module frame ,
regardless of racking system (rail-less or with rails). For installation of frame-mounted
power optimizers, refer to http://www.solaredge.com/sites/default/files/installing_
frame_mounted_power_optimizers.pdf.
Chapter 2: Installingthe Power Optimizers
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
13
Figure 3: Power optimizer clearance
NOTE
The images contained herein are for illustrative purposes only and may vary depending on product
models.
Step 1: Mounting the Power Optimizers
For each of the power optimizers1:
1. Determine the power optimizer mounting location and use the power optimizer
mounting brackets to attach the power optimizer to the support structure . For
frame-mounted power optimizers follow the instructions supplied with the
optimizers, or refer to https://www.solaredge.com/sites/default/files/installing_
frame_mounted_power_optimizers.pdf.
1Not applicable to smart modules.
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
14
Step1: Mountingthe Power Optimizers
Do not drill through the power optimizer or through the mounting holes. The drilling vibrations can
damage the power optimizer and will void the warranty.
3. Attach each power optimizer to the rack using M6 (1/4'') stainless steel bolts, nuts and washers or
other appropriate mounting hardware. Apply torque of 9.5 N*m / 7 lb*ft.
4. Verify that each power optimizer is securely attached to the module support structure.
5. Record power optimizer serial numbers and locations, as described in Reporting and Monitoring
Installation Data on page 44
Step 2: Connecting a PV Module to a Power
Optimizer
NOTE
Images are for illustration purposes only. Refer to the label on the product to identify the plus and
minus input and output connectors.
For each of the power optimizers:
l
Connect the Plus (+) output connector of the module to the Plus (+) input connector of the power
optimizer.
l
Connect the Minus (-) output connector of the module to the Minus (-) input connector of the
power optimizer.
Figure 4: Power optimizer connectors
Step 3: Connecting Power Optimizers in Strings
You can construct parallel strings of unequal length, that is, the number of power optimizers in each
string does not have to be the same. The minimum and maximum string lengths are specified in the
power optimizer datasheets. Refer to the SolarEdge Site Designer for string length verification.
NOTE
l
Use at least 11 AWG/ 4 mm² DC cables.
l
The total conductor length of the string (excluding power optimizers’ conductors; including home
runs and necessary extensions between optimizers) should not exceed:
o
2300 ft./ 700 m from DC+ to DC- of the inverter
Chapter 2: Installingthe Power Optimizers
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
15
The DC bus of each unit is separate and not shared for all units. Therefore in addition to following the
inverter design rules, each unit should follow the unit design rules as detailed in Technical
Specifications on page 1
1. Connect the Minus (-) output connector of the string’s first power optimizer to the Plus (+) output
connector of the string’s second power optimizer.
2. Connect the rest of the power optimizers in the string in the same manner.
Figure 5: Power optimizers connected in series
3. If you intend to monitor the installation, using the SolarEdge monitoring platform, record the
physical location of each power optimizer, as described in Providing Installation Information on page 45.
WARNING!
Input and output connectors are not watertight until mated. Open connectors should be mated to
each other or plugged with appropriate watertight caps.
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
16
Step3: ConnectingPower Optimizers inStrings
Step 4: Verifying Proper Power Optimizer
Connection
When a module is connected to a power optimizer, the power optimizer outputs a safe voltage of 1V.
Therefore, the total string voltage should equal 1V times the number of power optimizers connected in
series in the string. For example, if 10 power optimizers are connected in a string, then 10V should be
produced.
Make sure the PV modules are exposed to sunlight during this process. The power optimizer will only turn
ON if the PV module provides at least 2W.
In SolarEdge systems, due to the introduction of power optimizers between the PV modules and the
inverter, the short circuit current ISC and the open circuit voltage VOC hold different meanings from
those in traditional systems.
For more information about the SolarEdge system’s string voltage and current, refer to
the VOC and ISC in SolarEdge Systems Technical Note, available on the SolarEdge website at:
http://www.solaredge.com/files/pdfs/isc_and_voc_in_solaredge_systems_technical_
note.pdf .
To verify proper power optimizers connection:
Measure the voltage of each string individually before connecting it to the other strings or to the inverter.
Verify correct polarity by measuring the string polarity with a voltmeter. Use a voltmeter with at least
0.1V measurement accuracy.
NOTE
Since the inverter is not yet operating, you may measure the string voltage and verify correct polarity
on the DC wires inside the Connection Unit.
For troubleshooting power optimizer operation problems, refer to Power Optimizer Troubleshooting on
page 70.
Chapter 2: Installingthe Power Optimizers
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
17
Chapter 3: Installing the Primary and
Secondary Unit(s)
Install the units either before or after the modules and power optimizers have been installed.
First install the Primary Unit, then the Secondary Unit(s) (in any order).
CAUTION!
Do not rest the connectors at the bottom of the units on the ground, as it may damage them. To rest
a unit on the ground, lay it on its back.
Primary Unit Package Contents
l
Primary Unit (comprised of an inverter and Connection Unit) and pre- assembled cables that connect
to the Secondary Unit(s)
l
Mounting bracket kit
l
Two Allen screws for fastening the unit to the mounting bracket
l
Quick Installation guide
l
For built-in wireless communication: antenna and mounting bracket
l
Level, for marking the mounting brackets' positions
Secondary Unit Package Contents
l
Secondary Unit
l
Mounting bracket kit
l
Two Allen screws for fastening the unit to the mounting bracket
Identifying the Units
The stickers on the Primary Unit and on the Connection Unit specify the inverter's Serial Number and
Electrical Ratings.
When opening a site in the SolarEdge monitoring platform and when contacting SolarEdge support,
provide the inverter's serial number.
Primary Unit Interface
Figure 6: Primary Unit bottom and side interfaces
l
Mounting hole: for securing the unit to the bracket and for connecting an optional secondary
grounding cable.
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
18
Chapter 3: Installingthe Primary andSecondary Unit(s)
AC and DC conduit entries: Connection points of the Connection Unit.
l
Two communication glands, for connection of communication options. Each gland has three
openings. Refer to Setting Up Communication on page 52 for more information.
l
ON/OFF/P Switch:
Figure 7: ON/OFF/P switch
o
ON (1) - Turning this switch ON (after optimizer pairing) starts the operation of the power
optimizers, enables power production and allows the inverter to begin exporting power to the
utility grid
o
OFF (0) - Turning this switch OFF reduces the power optimizer voltage to a low safety voltage and
inhibits exportation of power. When this switch is OFF, the Primary and Secondary Units' control
circuitry remains powered up.
o
P - Moving and releasing the switch allows viewing system information via the LEDs and on the
SolarEdge SetApp mobile application screen and performing functions:
P Position duration
Function
Comments
Switch moved to P for less than
5 seconds, then released.
o
Displays production information for 5
seconds on the SetApp screen.
o
Displays error type indications (if exist)
for 5 seconds.
o
Activates the Wi-Fi access point for
connecting to the SolarEdge Inverter
SetApp
While the switch is in
P, all LEDs are ON
Switch moved to P for more than
5 seconds, then released.
Starts pairing
LEDs
l
LEDs: three LEDs indicate, by color and state (on/ off/ blinking1/ flickering2), different system
information, such as errors or performance indications.
Generally, the main LED indications are:
l
Blue ON - the inverter is communicating with the monitoring platform
l
Green ON - the system is producing
l
Green blinking - AC is connected but the system is not producing
l
Red ON - system error
1Blinking = Turns ON and OFF for the same duration
2Flickering = Turns ON for 100 mS and turns OFF for 5 seconds
Chapter 3: Installingthe Primary andSecondary Unit(s)
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
19
Figure 8: LEDs
The following table describes system performance information by LED color and ON/OFF/P switch
position:
Indication
ON/ OFF/ P
switch
position
LED color
Comment
Red
Green
Blue
Percentage of AC
Production:
0 - 33 %
ON (1)
OFF
ON
OFF
This indicates
power production as
percentage of rated
peak AC output
power
Percentage of AC
Production:
33 - 66 %
OFF
OFF
ON
Percentage of AC
Production:
66 - 100 %
OFF
ON
ON
Power optimizers
not paired
OFF
Blinking
o
S_OK: ON
o
No S_OK: OFF
S_OK :ON-
communication with
the monitoring
platform is
established
Pairing
Blinking
Blinking
Blinking
Wake-up/ Grid
Monitoring
OFF
Blinking
Blinking
System Producing
OFF
ON
o
S_OK: ON
o
No S_OK: OFF
Night mode
(no production)
OFF
Flickering
o
S_OK: ON
o
No S_OK: OFF
Inverter is OFF
(SafeDC)
OFF (0)
OFF
Blinking
Inverter is OFF
(DC not safe)
Blinking
Blinking
Inverter configuration
or reboot
ON / P
ON
ON
ON
Inverter firmware
upgrade
ON / P
Blinking
Blinking
Blinking
No AC power
Any
OFF
OFF
OFF
Error
ON
ON/ OFF/
Blinking/
Flickering
ON/ OFF /
Blinking/
Flickering
Refer to Errors and
Troubleshooting on
page 67
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
20
Primary Unit Interface
Connection Unit Interface
The Connection Unit is part of the Primary Unit.
There are two types of Connection Units, with MC4 connectors (see See Figure 10) or with cable glands for
DC connection( see Figure 11
Figure 9: Connection Unit front and side interface
l
Safety Switch: a manually operated safety switch for disconnecting the DC power of the SolarEdge
system.
l
Cables for connection to the Secondary Unit(s):
o
Communication cable
o
DC Cable
o
AC Cable
l
DC input: MC4 connectors / cable glands: for DC+/- connection of the PV installation, there are 3
glands / 6 MC4 connectors for each unit.
Each gland has 3 openings to support three strings:
o
each opening can support 5-8.8 mm PV cable outer diameter
o
each terminal block in the connection unit can support 4-10mm2 PV wire cross section
Figure 10: Connection Unit with MC4 Connectors bottom interface
for 1 Secondary Unit (left), for 2 Secondary Units (right)
Chapter 3: Installingthe Primary andSecondary Unit(s)
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
21
Figure 11: Connection Unit with glands bottom interface
for 1 Secondary Unit (left), for 2 Secondary Units (right)
l
AC output: cable gland for connection to the grid, M50 20-38mm diameter
l
AC protective earth gland: cable gland for grounding , 9-16 mm diameter
l
Communication gland: for connection of communication options. Refer to Setting Up Communication
on page 52.
Secondary Unit Interface
Figure 12: Secondary Unit bottom and side interfaces
l
The Secondary units connectors are for connection to the Primary Unit:
o
DC (MC4) connectors: for connection of the PV installation
o
Communication connector: for communication options
o
AC connector: for connection of the AC
l
Mounting hole: for securing the unit to the bracket and for connecting an optional secondary
grounding cable.
l
Grounding screw: for connecting an optional secondary grounding cable.
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
22
Secondary Unit Interface
Mounting and Connecting the Primary and
Secondary Unit(s)
The inverter is typically mounted vertically, and the instructions in this section are
applicable for vertical installation. Some SolarEdge inverters model can be installed
horizontally (above 10° tilt) as well as vertically. For information and instructions for
horizontal mounting refer to
http://www.solaredge.com/sites/default/files/application_note_horizontal_mounting_
of_three_phase_inverters.pdf
First mount the Primary Unit then the Secondary Unit(s).
Figure 13: Mounting bracket
NOTE
Make sure the mounting surface or structure can support the weight of the inverter and brackets, and
make sure that it spans the width of the mounting brackets.
CAUTION!
HEAVY OBJECT. To avoid muscle strain or back injury, use proper lifting techniques, and if required - a
lifting aid.
1. Determine the inverter mounting location, on a wall or stud framing . It is recommended to mount
the inverter in a location protected from direct sunlight.
2. To allow proper heat dissipation, maintain the following minimum clearance areas between the
inverter and other objects:
NOTE
The Primary unit is longer than the Secondary Unit, therefore make sure the mounting location is
high enough to fit the Primary Unit and leaves sufficient space for cable entry.
l
If installing a single inverter:
o
At least 20 cm (8") from the top and bottom of each unit. For the Primary Unit, make sure to leave
sufficient clearance for cable entry.
o
3 cm (1.2") from the right and left of the unit.
l
If installing multiple inverters:
o
When installing inverters one above of the other, leave at least 40 cm (16") between inverters.
When installing the Primary Unit , leave 40 cm (8") between the top of the Primary Unit and the
bottom of the Connection Unit.
o
When installing inverters side by side:
Chapter 3: Installingthe Primary andSecondary Unit(s)
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
23
Locations where the annual
average high temperature1 is
below 25˚C / 77˚F
20 cm / 8"
between inverters
3 cm / 1.2" between inverters (if
inverters are also installed one above
the other, maintain the indoor
installation clearance)
Locations where the annual
average high temperature1 is
above 25˚C / 77˚F
40 cm / 16"
between inverters
3. Position the mounting brackets against the wall and mark the required drilling holes locations with
the supplied level.
The level markings correspond to a distance of 3cm between units.
4. Drill two holes for each bracket and mount the brackets.
5. Put in the screws without tightening in order to correct positioning.
6. Place the level beneath the brackets and align the brackets, tighten the screws all the way and verify
that the brackets are firmly attached to the mounting surface.
7. Mount the Primary Unit:
l
Lift the Primary Unit from its sides.
l
Align the two indentations in the enclosure with the two triangular mounting tabs of the bracket,
and lower the unit until it rests on the bracket evenly (see Figure 14).
l
Insert the supplied screw through the right side of the heat sink and into the bracket
1Annual average high temperature – the average of the 12 monthly average highs, for example:
Refer to http://www.weatherbase.com/ to find the value in your location.
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
24
Mounting andConnectingthe Primary andSecondary Unit(s)
Figure 14: Hanging units
NOTE
If connecting secondary grounding,connect the grounding cable on either side of the chassis, to the
upper mounting screw or to the lower grounding screw,before hanging the unit on the bracket, see
Connecting the AC Grid to the Connection Unit and Connecting Grounding on page 1.
7. Mount the Secondary Unit(s):
l
There is no specific order for hanging the Secondary Units.
When installing a 2 unit inverter, mount the Secondary Unit to the left of the Primary Unit.
l
Lift the Secondary Unit(s) from the sides, or hold it at the top and bottom of the unit to lift into
place.
l
Align the two indentations in the enclosure with the two triangular mounting tabs of the bracket,
and lower the unit until it rests on the bracket evenly (see Figure 14).
l
Insert one of the supplied screws through the outer side of the heat sink and into the bracket.
Tighten the screws with a torque of 4.0N*m / 2.9 lb.*ft.
8. Secure the Connection Unit to the wall:
l
Mark the location of the bracket screw and drill the hole
l
Fasten the bracket using a standard bolt
l
Verify that the bracket is firmly attached to the mounting surface
Figure 15: Connection Unit bracket
9. Connect the Connection Unit cables to the Secondary Unit(s) connectors.
Chapter 3: Installingthe Primary andSecondary Unit(s)
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
25
Figure 16: Connecting the AC connector to a Secondary Unit
NOTE
When connecting the AC cable to the left secondary Unit, loop the cable ( see the following figure) to
prevent pressure on the gland.
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
26
Mounting andConnectingthe Primary andSecondary Unit(s)
Figure 17: Connecting the Connection Unit to the Secondary Unit
Chapter 3: Installingthe Primary andSecondary Unit(s)
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
27
Chapter 4: Connecting the AC and Strings to
the Connection Unit
This section describes how to connect the inverter to the AC grid, and to the PV strings .
Inverters of different models might be equipped with different sizes/ types of terminal blocks.
Grid Connection Guidelines
NOTE
In most countries, SolarEdge three phase inverters require neutral connection at all times (only grids
with neutral connection are supported).
In some countries, the SolarEdge three phase inverters can be connected to delta grids. For more
information prior to system installation refer to the Three Phase Inverters for Delta Grids application
note,
https://www.solaredge.com/sites/default/files/se_three_phase_inverters_for_
delta_grids.pdf.
and to Supported Countries application note to confirm compatibility:
http://www.solaredge.com/sites/default/files/se_inverters_supported_
countries.pdf; installing without confirmation may void the inverter warranty.
For more wiring information refer to the SolarEdge Recommended AC Wiring Application Note, available on
the SolarEdge website at http://www.solaredge.com/files/pdfs/application-note-recommended-
wiring.pdf.
Connecting the AC Grid to the Connection Unit
Figure 18: Inside the Connection Unit
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
28
Chapter 4: Connectingthe AC andStrings tothe ConnectionUnit
Functional electrical earthing of DC-side negative or positive poles is prohibited because the inverter
has no transformer. Grounding (earth ground) of module frames and mounting equipment of the PV
array modules is acceptable.
NOTE
SolarEdge's fixed input voltage architecture enables the parallel strings to be of different lengths.
Therefore, they do not need to have the same number of power optimizers, as long as the length of
each string is within the permitted range.
WARNING!
Turn OFF the AC before connecting the AC terminals. If connecting equipment grounding wire,
connect it before connecting the AC Line and Neutral wires.
NOTE
It is recommended to connect communication connections (Setting Up Communication on page
52Setting Up Communication on page 52 before connecting the AC, for easier access to the
communication board.
Connecting the AC Grid and Grounding to the
Connection Unit
This section describes how to connect the AC grid and grounding to the Connection Unit .
Grounding
For grounding the Primary unit you can:
l
thread a 4 wire AC cable through the AC gland and use an additional wire/cable for PE.
-or-
l
thread a 5 wire AC cable with a PE (grounding) wire through the AC gland, see the following
procedure. The AC gland supports a cable of 20-38mm diameter, for larger cables use the previous
option.
To connect AC and ground:
1. Turn OFF the AC circuit breaker.
2. Open the Connection Unit cover: Release the six Allen screws and carefully move the cover
horizontally before lowering it.
CAUTION!
When removing the cover, make sure not to damage internal components. SolarEdge will not be
held responsible for any components damaged as a result of incautious cover removal.
Chapter 4: Connectingthe AC andStrings tothe ConnectionUnit
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
29
Figure 19: Insulation stripping – AC
4. Open the AC cable gland and insert the cable through the AC gland.
WARNING!
Turn OFF the AC before connecting the AC terminals. If connecting equipment grounding wire,
connect it before connecting the AC Line and Neutral wires.
5. If using a separate wire / cable for grounding , insert the additional wire/ cable for grounding through
the PE gland.
l
Strip the required length of the external and internal cables insulation.
l
Open the PE cable gland and insert the cable through the PE gland.
6. Connect the grounding wire to the grounding terminal block and tighten with a torque of
15N*m / 12 lb*ft.
7. Remove the screws from the AC terminal blocks.
8. Crimp ring terminals on the AC wires. The ring terminals width is maximum 24 mm.
9. Connect the wires to the terminal blocks with a proper tool according to the labels on the terminals.
10. Tighten the screws of each terminal with a torque of 2.0 N*M / 18 lb-in
Figure 20: Wire connections to terminal block
Wire type
Connect to terminal
Line 1
L1
Line 2
L2
Line 3
L3
Neutral
N
Secondary Grounding
If required, ground the units as described in the following figure using a grounding cable, a grounding
screw,two washers, a ring terminal and a serrated washer. You can connect the grounding cable to
either side of a unit and to either the mounting hole or grounding screw. You can connect grounding to
the Primary Unit and to each of the Secondary Units, as required.
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
30
Secondary Grounding
Figure 21: Secondary grounding
Connecting the Strings to the Connection Unit
You can connect systems with multiple DC strings in parallel to the DC input terminals of the Connection
Unit.
NOTE
The DC bus of each unit is separate and not shared for all units. Therefore in addition to following the
inverter design rules, each unit should follow the unit design rules as detailed in Technical
Specifications.
Inverters may have a different number of pairs of DC input terminals, depending on the inverter power
rating. If more strings are required, they can be connected in parallel using an external combiner box
before connecting to the Connection Unit; strings connected to different units cannot be combined.
When connecting multiple strings, it is recommended to run separate circuits to the Connection Unit or
to position the combiner box near the Connection Unit.This simplifies commissioning by allowing testing
and servicing near the inverter.
To connect the strings to the Connection Unit with glands:
1. Strip 5⁄16'' (8 mm) of the DC wire insulation.
2. Insert the DC cable from the PV installation, into the DC gland on the Connection Unit.
3. Connect the DC wires to the DC+ and DC- terminal blocks, according to the labels on the terminals.
or; connect two wires (DC+ and DC-) per string:
a. Use a standard flat-blade screwdriver to connect the wires to the spring-clamp terminals. The
screwdriver blade should fit freely in the terminal opening. Too large a blade can crack the plastic
housing.
b. Insert the screwdriver and firmly tilt it to press the release mechanism and open the clamp.
c. Insert the wire into the top opening (see Figure 22).
d. Remove the screwdriver – the wire is automatically clamped.
CAUTION!
Ensure that the Plus (+) wire is connected to the + terminal and that the Minus (-) wire is connected to
the Minus (-) terminal connector.
Chapter 4: Connectingthe AC andStrings tothe ConnectionUnit
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
31
Figure 22: DC Spring-clamp terminals
5. Close the Connection Unit cover: Attach the switch cover and secure it by tightening the four screws
with a torque of 1.2 0.9 ft.*lb.
To connect the strings to the Connection Unit with MC4 connectors:
Connect the DC connectors of each string to the DC+ and DC- connectors according to the labels on the
Connection Unit.
Figure 23: Connection Unit with MC4 Connectors
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
32
Connectingthe Strings tothe ConnectionUnit
Selecting a Residual Current Device (RCD)
IMPORTANT SAFETY FEATURE
All SolarEdge inverters incorporate a certified internal Residual Current Device (RCD) in order to
protect against possible electrocution and fire hazard in case of a malfunction in the PV array,
cables or inverter. There are 2 trip thresholds for the RCD as required for certification (DIN VDE
0126-1-1). The default value for electrocution protection is 30 mA per unit , and for slow rising
current is 300 mA per unit.
If an external RCD is required by local regulations, check which type of RCD is required for the relevant
electric code. Install the residual-current device (RCD) in accordance with the applicable local standards
and directives. SolarEdge recommends using a type A RCD. When required by local regulations, the use of
an RCD type B is permitted.
Use at least 600mA RCD for a 2 unit inverter and at least 900mA RCD for a 3 unit inverter.
NOTE
For multiple inverters, an RCD per inverter is required.
You have completed installing the system, proceed to the next chapter to activate and commission it,
then to Setting Up Communication on page 52, to set up required communication options and to set up
master slave configurations, if required.
Chapter 4: Connectingthe AC andStrings tothe ConnectionUnit
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
33
Chapter 5: Activating, Commissioning and
Configuring the System Using SolarEdge
Inverter SetApp
If applicable, you can connect communication options at this stage, as described inSetting Up
Communication on page 52.
Once all connections are made, the system should be activated and commissioned using the SolarEdge
Inverter SetApp mobile application. You can download the app from the iTunes and Google Play app
stores prior to reaching the site.
Internet connection is required for the download and for the one-time registration, however not
required for using the SetApp.
Step 1: Activating the Installation
During system activation, a Wi-Fi connection is created between the mobile device and the inverter and
the system firmware is upgraded.
Before activation - download, register (first time only) and log-in to SetApp on your mobile device.
Internet connection is required for the download and for the one-time registration.
To activate the installation:
1. Turn ON the AC circuit breaker on the main distribution panel.
2. Move the ON/ OFF/ P switch to the ON position.
3. Move the Connection Unit DC switch to the ON position.
4. Open SetApp and follow the instructions on the screen (scan the inverter bar-code; move the
ON/OFF/P switch to P position and release within 5 sec. back to ON (1) position). SetApp creates a Wi-
Fi connection, upgrades the inverter CPU firmware and activates the inverter.
5. When the activation is complete, do one of the following:
l
Select Activate Another Inverter to continue activating additional inverters
l
Select Start Commissioning for pairing and other system configuration. The Commissioning
screen is displayed. Refer to the next section for more information.
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
34
Chapter 5: Activating, CommissioningandConfiguringthe SystemUsingSolarEdge
Step 2: Commissioning and Configuring the
Installation
This section describes how to use the SetApp menus for commissioning and configuring the inverter
settings.
Menus may vary in your application depending on your system type.
To access the Commissioning screen:
Do one of the following:
l
During first time installation: Upon Activation completion, in the SetApp, tap Start Commissioning.
The main Commissioning menu screen is displayed:
Commissioning
Count r y and Lang uag e ›
Pair ing ›
Communicat ion ›
Dev ice Manag er ›
Pow er Cont r ol ›
Maint enance ›
Infor mat ion ›
S it e Config ur at ion ›
S t at us ›
l
If the inverter has already been activated and commissioned:
a. If not already ON - turn ON AC to the inverter by turning ON the circuit breaker on the main
distribution panel.
b. If not already ON - move the Connection Unit switch to the ON position.
c. Open SetApp and follow the instructions on the screen (scan the inverter bar-code; move the
ON/OFF/P switch to P position (for less than 5 sec) and release).
The mobile device creates a Wi-Fi connection with the inverter and displays the inverter main
Status screen.
Status
Chapter 5: Activating, CommissioningandConfiguringthe SystemUsingSolarEdge
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
35
P_OK: 138 of 141
Optimizers Connected
S_OK
Server Connected
Status
Production
Switch
ON
CosPhi
1.00
Limit
No Limit
Country
Netherlands
Voltage
850 Vdc
Temp
156 F
Fan
OK
Commissioning
d. Tap Commissioning at the bottom of the screen. The main Commissioning menu screen is
displayed.
In the main menus, tap the menu red arrows (›) to perform the system commissioning or configuration
task. Tap the Back arrow (‹) to return to the previous menu.
The next sections provide more information about configuration options (in addition to Country and
Language and Pairing, described in Step 2: Commissioning and Configuring the Installation on page 35).
Setting Country and Language
1. From the Commissioning screen select Country and Language .
Country and Language
Count r y
Germ any q
Lang uag e
Deut sch (Germ any ) q
2. From the Country drop-down list, select the required country setting.
WARNING!
The inverter must be configured to the proper setting in order to ensure that it complies with the
country grid code and functions properly with the country grids.
1. From the Language drop-down list, select the language.
2. Tap OK.
Pairing
Once all connections are made, all the power optimizers must be logically paired to their inverter. The
power optimizers do not start producing power until they are paired. This step describes how to assign
each inverter to the power optimizers from which it will produce power.
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
36
SettingCountry andLanguage
Tap t he but t on below t o st ar t t he
pair ing pr ocess
S t art pairing
2. Tap Start Pairing.
3. When Pairing Complete is displayed, the system startup process begins:
Since the inverter is ON, the power optimizers start producing power and the inverter starts
converting AC.
WARNING!
When you turn ON the inverter ON/OFF/P switch, the DC cables carry a high voltage and the
power optimizers no longer output a safe 1V output.
When the inverter starts converting power after the initial connection to the AC, the inverter enters
Wakeup mode until its working voltage is reached. This mode is indicated by the flickering green
inverter LED.
When working voltage is reached, the inverter enters Production mode and produces power. The
steadily lit green inverter LED indicates this mode.
4. Tap OK to return to the main menu.
Chapter 5: Activating, CommissioningandConfiguringthe SystemUsingSolarEdge
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
37
1. Select the Communication menu to define and configure the following:
l
The communication option used by the inverter to communicate with the SolarEdge monitoring
platform
l
The communication option used to communicate between multiple SolarEdge devices or other
external non-SolarEdge devices, such as electricity meters or loggers.
Communication
Server
LAN
›
LAN
DHCP
›
RS485-1
SolarEdge Slave
›
RS485-2
Multi -Device
(Modbus)
›
ZigBee
Home Automation
Master
›
Wi-Fi
SEDG-7E129A09-33
›
RS232
SolarEdge GSM
Cellular
N/A
›
GPIO
RRCR
›
Modbus
TCP port
Disable
›
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
38
Communication
2. Tap the Server red arrow to set the communication method to be used for communication between
devices and the SolarEdge monitoring platform. The default is LAN. Refer to Setting Up Communication
on page 52 for a full description of these communication options.
NOTE
The Server menu shows only the communication options installed in the inverter.
Server
LAN
S_OK
ü
Cellular
Wi-Fi
RS485-1
SolarEdge Slave
ZigBee
Slave
For detailed information about all the configuration options, refer to the Communication
Options Application Note, available on the SolarEdge website at
https://www.solaredge.com/sites/default/files/solaredge-communication_options_
application_note_v2_250_and_above.pdf.
Chapter 5: Activating, CommissioningandConfiguringthe SystemUsingSolarEdge
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
39
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
40
Power Control
Date and Time: Set the internal real-time clock. If connected to the SolarEdge monitoring platform,
the date and time are set automatically and only time zone should be set.
l
Temperature: Set the temperature units to use: Celsius or Fahrenheit
l
Reset Counters: Resets the accumulated energy counters that are sent to the SolarEdge monitoring
platform
l
Factory Reset: Performs a general reset to the default device settings.
l
Arc Fault Circuit Interrupter (AFCI): Enables or disables production interruption in case of arc-fault,
sets the reconnection mode, and enables or disables manual AFCI self-test.
Refer to https://www.solaredge.com/sites/default/files/arc_fault_detection_
application_note.pdf .
l
Firmware Upgrade: Perform a software upgrade.
l
Load / Save Configuration: Enables saving or loading system parameters from one
inverter to another.
Chapter 5: Activating, CommissioningandConfiguringthe SystemUsingSolarEdge
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
41
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
42
Maintenance
Please have these numbers ready when you contact SolarEdge Support.
l
Serial Number - The inverter serial number as appears on the enclosure sticker
l
Hardware IDs: Displays the following HW serial numbers (if exist, and connected to the inverter):
o
This inverter: the inverter's ID
o
Meter # : Modbus meter ID (up to 3 meters can be connected)
o
ZB: ZigBee Card MAC address
o
WiFi: Wi-Fi MAC address
l
Error Log: Displays the last five errors, and enables resetting (clearing) the log.
l
Warning Log: Displays the last five warnings, and enables resetting (clearing) the log.
Chapter 5: Activating, CommissioningandConfiguringthe SystemUsingSolarEdge
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
43
Step 3: Verifying Proper Activation and
Commissioning
1. Select Information and verify that the correct firmware versions are installed on each inverter.
2. Select Status and verify that inverter is operating and producing power (see also Viewing System
Status on page 46).
3. Verify that the number of paired optimizers is the same as the number of physically installed power
optimizers.
4. Verify that additional configurations were properly set by viewing the relevant Status screens.
5. Verify that the green inverter LED is steadily lit.
Your SolarEdge power harvesting system is now operational.
Reporting and Monitoring Installation Data
NOTE
This step requires connecting one of the communication options. Refer to Setting Up
Communication on page 52.
The SolarEdge Monitoring System
The SolarEdge cloud-based monitoring platform enables accessing SolarEdge site
information, including up-to-date information viewed in a physical or logical view. The
monitoring platform is described in detail in the SolarEdge Monitoring Platform User
Guide, available on the SolarEdge website at
http://www.solaredge.com/files/pdfs/solaredge-monitoring-platform-user-guide.pdf.
The SolarEdge monitoring platform can display logical and physical layouts of the
installed system, as follows:
l
Logical Layout: Shows a schematic logical layout of the components in the system, such as: inverters,
strings and modules, as well as their electrical connectivity. This view enables you to see which
modules are connected in each string, which strings are connected to each inverter, and so on.
l
Physical Layout: Shows a schematic physical layout of the components in the system, such as:
inverters, strings and modules, as well as their electrical connectivity. This view enables a bird’s eye
view of the actual location of a system component.
Using the platform, you can:
l
View the latest performance of specific components.
l
Find under-performing components, such as modules, by comparing their performance to that of
other components of the same type.
l
Pinpoint the location of alerted components using the physical layout.
l
See how components are connected to each other.
l
Pair power optimizers remotely.
To display a logical layout, insert the inverter serial number in the new site created in the application.
When the communication between the inverter and the monitoring server is established, the logical
layout is displayed.
To display a physical layout, you need to map the locations of the installed power optimizers. To generate
a physical mapping, use either the Site Mapper application or the physical layout editor in the monitoring
platform.
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
44
Step3: VerifyingProper ActivationandCommissioning
Providing Installation Information
Use one of the following methods to connect your PV system to the SolarEdge cloud-based monitoring
platform (monitoring platform).
Site Mapper Application
Android
Use the SolarEdge Site Mapper smart-phone application to scan the power optimizer and inverter 2D bar-
codes, and map the system physical layout in the SolarEdge monitoring platform.This application is
integrated with the SolarEdge monitoring platform and enables:
l
Simple on-site registration of new systems.
l
Creating, editing and verifying system physical layout.
l
Scanning and assigning the power optimizer serial number to the correct location in the system
physical layout.
For detailed information, refer to the SolarEdge Site Mapper demo movies:
l
Creating new sites using the SolarEdge Site Mapper mobile application
l
Mapping power optimizers using the SolarEdge Site Mapper mobile application
iPhone
Use the SolarEdge Site Mapper smartphone application to scan the power optimizer and inverter 2D bar-
codes. This application creates an XML file that can be uploaded to the SolarEdge monitoring platform
during site registration. The SolarEdge Site Mapper can be downloaded from the application stores.
For detailed information, refer to the SolarEdge Site Mapper Software Guide or to the Site
Mapper demo movie, available on the SolarEdge website at
http://www.solaredge.com/groups/installer-tools/site-mapper.
Chapter 5: Activating, CommissioningandConfiguringthe SystemUsingSolarEdge
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
45
Creating a Site in the SolarEdge Monitoring Platform
Create the site in the monitoring platform using the registration form available at
https://monitoring.solaredge.com/solaredge-web/p/login. Fill out all required
information in the form, which includes information about your installation, as well as
details about its logical and physical mapping.
Paper Template
Fill out the Physical Layout Template (downloadable from the SolarEdge site) using the
detachable 2D barcode stickers on each power optimizer. Once the form is completed,
scan it and upload the scanned file to the SolarEdge monitoring platform during site
registration. For an example paper template, refer to
http://www.solaredge.com/files/pdfs/physical-layout-template.pdf.
Viewing System Status
During normal operation, the Status screen displays all the inverter settings and operation status.
Scrolling down displays the values one after the other, as described in the following sections.
The LED indication provides more information about system performance; Refer to LEDs on page 1LEDs
on page 19.
To access the Status screen:
Do one of the following:
l
During first time Commissioning and configuration: From the Commissioning menu select Status.
The main inverter Status screen is displayed (see below)
l
If the inverter has already been activated and commissioned - open SetApp and follow the
instructions on the screen (scan the inverter bar-code; move the ON/OFF/P switch to P position (for
less than 5 sec) and release).
The mobile device creates a Wi-Fi connection with the inverter and displays the inverter main Status
screen.
A red or orange icon (for example:
) may appear at the top left corner of a status cell, indicating an
error. The color indicates error severity (red is top severity). The error description or information appears
on the screen. Tap the error line for more information and troubleshooting instructions, and refer to
Errors and Troubleshooting on page 67.
A gray clock icon (
) may appear at the top left corner of a status cell, indicating a temporary status,
such as a connection process. When the process is complete, the icon disappears and a constant status
message is displayed.
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
46
CreatingaSite inthe SolarEdge MonitoringPlatform
Main Inverter Status
Status
Inverter
SN 07318000C
Power
100 kW
Voltage
277 Vac
Frequency
60.9 Hz
P_OK: 138 of 141
Optimizers Connected
S_OK
Server Connected
Status
Production
Switch
OFF
CosPhi
1.00
Limit
No Limit
Country
Netherlands
Voltage
850 Vdc
Temp
20 C
Fan
OK
Switch Off. Production disabled ›
Commissioning
l
Inverter: The inverter serial number
l
Power: The AC output power
l
Voltage (Vac): The AC output voltage
l
Frequency: The AC output frequency
l
P_OK: xxx of yyy: There is a connection to the power optimizers and at least one power optimizer is
sending monitoring data. XXX is the number of power optimizers for which telemetries have been
received in the last two hours. YYY is the number of paired power optimizers identified during the
most recent pairing process. If XXX and YYY are not equal, there may be a problem in one or more
power optimizers.
l
S_OK: The connection to the SolarEdge monitoring platform is successful (appears only if the inverter
is connected to the monitoring platform).
l
Status: The inverter operation status: Off, Not Paired, Night Mode, Error, Pairing, or Production
l
Switch: Indicates the position of the inverter ON/OFF/P switch: On, Off, or P position.
l
CosPhi: Indicates the ratio between active and reactive power.A negative value indicates a lagging
CosPhi.
For more information, refer to the Power Control Application Note, available on the
SolarEdge website at http://www.solaredge.com/files/pdfs/application_note_
power_control_configuration.pdf.
l
Limit: The inverter maximum output power
l
Country: The selected country and grid setting
l
Voltage (Vdc): The DC input voltage
l
Temp (°C or °F): The inverter heat sink temperature
Chapter 5: Activating, CommissioningandConfiguringthe SystemUsingSolarEdge
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
47
Multiple Inverters Status
The Multiple Inverters status screen shows the status of all inverters connected to a master inverter in a
chain (bus). The master inverter is displayed first, and the connected inverters (slaves) appear one after
the other when scrolling.
For inverters with two secondary units, the status of secondary units is displayed on the screen. If a
secondary unit is not operating, its column is grayed-out.
Status
Multi-inverters
Production
1.00 MW
Limit
1.00 MW
Inverters
10/10
Inverter
SN 07318000C
Power
100 kW
Voltage
277 Vac
Frequency
60.9 Hz
P_OK: 141 0f 141
Optimizers Connected
S_OK
Server Connected
Status
Production
Switch
OFF
CosPhi
1.00
Limit
Export
Country
ITA
Inverter Units
Secondary 1
N/C
Voltage
N/A
P_OK
N/A
Temperature
N/A
Fan
N/A
Primary
SN 07318000C
Voltage
850 Vdc
P_OK
47 0f 47
Temperature
156 F
Fan
OK
Secondary 2
SN 07318000E
Voltage
850 Vdc
P_OK
47 0f 47
Temperature
156 F
Fan
OK
Switch Off. Production disabled ›
Commissioning
l
Site status:
o
Production: The AC output power
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
48
Multiple Inverters Status
2 of 2
Cellular
N/A
Wi-Fi
NC
ZigBee
NC
For each communication option, one of the following statuses is displayed:
l
Connected: The inverter established a successful connection and communication with the specified
server port/device
l
NC: Not Connected. Refer to Troubleshooting Communication on page 71
l
S_OK: The connection to the SolarEdge monitoring platform is successful (should appear only if the
inverter is connected to the server)
l
N/A : Not Applicable
l
x of y: Number of devices connected out of all devices
l
Temporarily displayed (with a
clock sign):
o
Initializing communication
o
Connecting to a network
o
Connecting to SolarEdge servers
l
Error message (with the
sign). Refer to Troubleshooting Communication on page 71.
Chapter 5: Activating, CommissioningandConfiguringthe SystemUsingSolarEdge
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
49
Inverter Energy Status
Displays the total energy produced during the last day, month, year and since inverter installation.
Inverter Energy
Today
45 kWh
This Month
1.14 MWh
This Year
13.68 MWh
Total: 41.03 MWh
l
Today: since midnight
l
This Month: since 1st of the current month
l
This Year: since January 1st
l
Total (Wh): The inverter total energy. If an external meter is installed, the value displayed in this line
depends on the meter type connected to the inverter and its location:
o
If a bidirectional meter is connected at the consumption point, this value is the consumed energy.
o
If the meter is installed at the production point, this value is the energy produced by the site.
o
If the meter is installed at the grid connection point, this value is the energy exported to the grid.
Meter Status
Meters
Production – RS485-2 Modbus ID #2
Status: OK
Power: 7.60kW, Energy: 13.68MWh
Export – GPIO S0 meter
1000 pulses per kWh
Power: 7.60kW, Energy: 13.68MWh
l
Type and function: Displays the meter functionality (Production, Export, Import, Export+Import)
l
Status: Displays OK if the meter is communicating with the inverter
l
: If there is a meter error, it is displayed in this line.
l
Power: Depending on the meter type connected to the inverter, this line displays the exported or
imported power
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
50
Inverter Energy Status
This data is accumulated according to an internal real-time clock.
Chapter 5: Activating, CommissioningandConfiguringthe SystemUsingSolarEdge
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
51
Chapter 6: Setting Up Communication
The inverter sends the following information to the monitoring platform:
l
Power optimizer information received via the DC power lines (the PV output circuit)
l
Inverter information
l
Information of any other connected devices
This chapter describes setting up communication between:
l
the inverter and the monitoring platform through the Internet (wired/ wireless), or through a cellular
connection
l
multiple inverters for a master/slave configuration
Communication setup is not required for power harvesting, however it is needed for using the SolarEdge
monitoring platform.
NOTE
It is recommended to connect communication connections before connecting the AC, for easier
access to the communication board.
CAUTION!
When connecting the communication cables, make sure that the ON/OFF/P switch at the bottom of
the inverter is turned OFF, and the AC is turned OFF.
When configuring the communication parameters, make sure that the ON/OFF/P switch is in P
position, and the AC is turned ON.
When connecting the communication cables, make sure that the ON/OFF/P switch on the Connection
Unit is turned OFF, and the AC is turned OFF.
When configuring the communication parameters, make sure that the ON/OFF/P switch on the
Connection Unit is OFF, and the AC is turned ON.
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
52
Chapter 6: SettingUpCommunication
Chapter 6: SettingUpCommunication
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
53
two large openings
4.5-7 mm
Cellular
one small opening
2-4 mm
external antenna cable
2
three large openings
2.5-5 mm
power reduction and RS485-2
Connection Unit
1
three openings
Ethernet connection (CAT5/6)and RS485 -1
Figure 24: Primary Unit
Figure 25: Connection Unit bottom
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
54
CommunicationConnectors
Primary Unit Communication Board
Open the Primary Unit cover to access the communication board to:
l
GSM- connect a GSM modem. See Communication Options on page 53.
l
RS485-1 - connected to the Connection Unit communication board. For connecting
multiple inverters over the same bus, connect RS485 wires to the terminal blocks on
the Connection Unit Communication Board. For more information see, Connection
Unit Communication Board on page 56
l
RS485-2 - connect a non-SolarEdge device, such as a meter or a third party data logger, to the RS485-2
connector. Every pair of in and out wires are connected to the same pin.
l
Power Reduction Interface (PRI) - connect a power reduction device. See application_note_power_
control_configuration.pdf
Figure 26: Primary Unit communication board
Chapter 6: SettingUpCommunication
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
55
Connection Unit Communication Board
Open the Connection Unit cover to access the communication board to:
l
connect a standard RJ45 connector for Ethernet.
l
connect RS485 wires to the terminal blocks for RS485 connection. There are two 3-pin terminal
blocks, one for connecting the preceding device in the bus and one for connecting the following
device. Additionally, the RS485 port has a built-in surge protection.
Figure 27: Connection Unit Communication board
Removing the Connection Unit Cover
If the Connection Unit is not already removed, remove it as described in the following section.
To remove the Connection Unit cover:
1. Turn OFF the inverter ON/OFF switch, and wait until the green LED is blinking , indicating that the DC
voltage is safe (<50V), or wait five minutes before continuing to the next step.
2. Disconnect the AC to the inverter by turning OFF the circuit breakers on the distribution panel.
3. Open the Connection Unit cover:
a. Release the six Allen screws of the cover.
b. Tilt the top of the cover towards you.
c. Slide the cover down and remove it.
CAUTION!
When removing the cover, make sure not to damage internal components. SolarEdge will not be
held responsible for any components damaged as a result of incautious cover removal.
Creating an Ethernet (LAN) Connection
This communication option enables using an Ethernet connection to connect the inverter to the
monitoring platform through a LAN.
Ethernet cable specifications:
l
Cable type – a shielded Ethernet cable (Cat5/5E STP) may be used
l
Maximum distance between the inverter and the router – 100 m/ 330 ft.
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
56
ConnectionUnit CommunicationBoard
If using a cable longer than 10 m / 33 ft in areas where there is a risk of induced
voltage surges by lightning, it is recommend to use external surge protection
devices.
For details refer to: http://www.solaredge.com/files/pdfs/lightning_surge_
protection.pdf.
Figure 28: Example of Ethernet connection
To connect the Ethernet cable:
1. Open the communication gland.
CAUTION!
The gland includes a rubber waterproof fitting, which should be used to ensure proper sealing.
2. Remove the rubber fitting from the gland and insert the CAT5/6 cable through the gland and through
the gland opening in the Connection Unit .
3. Remove the plastic seal from the large opening that has a cut in the rubber fitting.
4. Push the cable into the cut opening of the rubber fitting.
Figure 29: Communication gland and rubber fitting
CAT5/5E STP cables have eight wires (four twisted pairs), as shown in the diagram below. Wire colors may
differ from one cable to another. You can use either wiring standard, as long as both sides of the cable
have the same pin-out and color-coding.
Chapter 6: SettingUpCommunication
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
57
RJ45 Pin #
Wire Color1
10Base-T Signal
100Base-TX Signal
T568B
T568A
1
White/Orange
White/Green
Transmit+
2
Orange
Green
Transmit-
3
White/Green
White/Orange
Receive+
4
Blue
Blue
Reserved
5
White/Blue
White/Blue
Reserved
6
Green
Orange
Received-
7
White/Brown
White/Brown
Reserved
8
Brown
Brown
Reserved
Figure 30: Standard cable wiring
5. Use a pre-crimped cable to connect via the gland to the RJ45 port on the inverter's communication
board or, if using a spool of cable, connect as follows:
a. Insert the cable through the gland.
b. Remove the cable’s external insulation using a crimping tool or cable cutter and expose eight
wires.
c. Insert the eight wires into an RJ45 connector, as described Figure 30.
d. Use a crimping tool to crimp the connector.
e. Connect the Ethernet connector to the RJ45 port on the communication board as shown in
Figure 30.
Figure 31: Connection Unit Communication board
6. For the switch/router side, use a pre-crimped cable or use a crimper to prepare an RJ45
communication connector.
1The connection does not support RX/TX polarity change. Supporting crossover Ethernet cables depends on the switch
capabilities.
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
58
CreatinganEthernet (LAN) Connection
There are no LED indicators on the Ethernet connector, if the inverter is not communicating with
the monitoring platform through a LAN refer toTroubleshooting Communication on page 71.
Chapter 6: SettingUpCommunication
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
59
ELECTRICAL SHOCK HAZARD. Do not touch uninsulated wires when the Connection Unit
over is removed.
d. Use the SolarEdge SetApp to access the Commissioning main menu screen as described in
Communication on page 38.
e. From the main menu tap Communication. The Communication screen is displayed:
Communication
Server
LAN
›
LAN
DHCP
›
RS485-1
SolarEdge Slave
›
RS485-2
Multi -Device
(Modbus)
›
ZigBee
Home Automation
Master
›
Wi-Fi
SEDG-7E129A09-33
›
RS232
SolarEdge GSM
Cellular
N/A
›
GPIO
RRCR
›
Modbus
TCP port
Disable
›
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
60
CreatinganEthernet (LAN) Connection
The system automatically establishes communication with the monitoring platform as it is
configured to LAN by default.
NOTE
If your network has a firewall, you may need to configure it to enable the connection to the
following address:
l
Destination Address: prod.solaredge.com
l
Modbus TCP Port: 22222 (for incoming and outgoing data)
Creating an RS485 Bus Connection
The RS485 option enables creating a bus of connected inverters, consisting of up to 31 slave inverters and
1 master inverter. Using this option, inverters are connected to each other in a bus (chain) via their RS485
connectors, thus allowing to connect only the master inverter to the monitoring platform. The first and
last inverters in the chain must be terminated as described in RS485 Bus Configuration on page 64
RS485 wiring specifications:
l
Cable type: Min. 3-wire shielded twisted pair (a shielded Ethernet cable (Cat5/5E STP) may be used)
l
Wire cross-section : 0.2- 1 mm²/ 24-18 AWG
l
Maximum distance between first and last devices: 1 km /3300 ft.
The following sections describe how to physically connect the RS485 bus and how to configure the bus.
Chapter 6: SettingUpCommunication
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
61
To connect the RS485 communication bus:
1. Open the communication gland.
CAUTION!
The gland includes a rubber waterproof fitting, which should be used to ensure proper sealing.
2. Remove the rubber fitting from the gland and insert the CAT5/6 cable through the gland and through
the gland opening in the Connection Unit.
3. Remove the seal from one of the openings in the communication gland and insert the wire through
the opening.
4. Pull out both 3 -pin RS485 terminal blocks, as shown below:
Figure 32: RS485 connectors and termination switch
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
62
CreatinganRS485Bus Connection
Figure 33: RS485 terminal block wire connections
6. Insert the wire ends into the G, A and B pins shown above. Use one terminal block for the previous
inverter in the bus and the other terminal block for the next inverter in the bus, as shown in Figure 34.
You can use any color wire for each of the A, B and G connections, as long as the same color wire is
used for all A pins, the same color for all B pins and the same color for all G pins.
7. Connect all B, A and G pins in all inverters. The following figure shows this connection schema:
Figure 34: Connecting the inverters on a bus
8. Tighten the terminal blocks screws.
9. Check that the wires are fully inserted and cannot be pulled out easily.
10. Push the RS485 terminal blocks firmly all the way into the connectors on the communication board,
see Figure 32.
11. Terminate the first and last inverters on the bus by moving the termination switch to ON (left
position). The other inverters on the bus should have the termination switch OFF (right position).
Chapter 6: SettingUpCommunication
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
63
RS485 Bus Configuration
To connect to the monitoring platform:
1. Designate a single inverter as the connection point between the RS485 bus and the SolarEdge
monitoring platform. This inverter will serve as the master inverter.
2. Connect the master to the SolarEdge monitoring platform via the LAN option (refer to Creating an
Ethernet (LAN) Connection on page 56) or any of the other options.
To configure the RS485 bus:
All inverters are configured by default as slaves. To configure the master:
1. Verify the ON/OFF/P switch is OFF.
2. Verify the AC is on.
3. Turn ON the Connection Unit.
4. Use SetApp to access the Commissioning main menu screen as described in Communication on page
38.
5. From the main menu tap Communication. The Communication screen is displayed:
Communication
Server
LAN
›
LAN
DHCP
›
RS485-1
SolarEdge Slave
›
RS485-2
Multi -Device
(Modbus)
›
ZigBee
Home Automation
Master
›
Wi-Fi
SEDG-7E129A09-33
›
RS232
SolarEdge GSM
Cellular
N/A
›
GPIO
RRCR
›
Modbus
TCP port
Disable
›
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
64
RS485Bus Configuration
RS485-1 è Protocol è SolarEdge Master
l
RS485-1 è Slave Detect
The system starts automatic detection of the SolarEdge slave inverters connected to the master
inverter. The inverter should report the correct number of slaves. If it does not, verify the connections
and terminations.
RS485-1
Protocol
SolarEdge (Master)
›
Device ID
1
Slave Detect
3 Slaves
›
Long Slave Detect
3 Slaves
›
Slave List
3 Slaves
›
7. To check the slave IDs and last communication time, select RS485-1 è Slave List.
8. Verify the connection of the master to the SolarEdge monitoring platform, as described in the next
section.
Verifying the Connection
After connecting and configuring a communication option, perform the following steps to check that
the connection to the monitoring server has been successfully established.
1. If the Connection Unit cover is not closed, close it: Attach the Connection Unit cover and secure it by
tightening the screws with a torque of 10.3 N*m/ 7.5 lb.*ft.For proper sealing, first tighten the corner
screws and then the two central screws.
2. Access the Status screen:
a. If not already ON - turn ON AC to the inverter by turning ON the circuit breaker on the main
distribution panel.
b. If not already ON - move the Connection Unit switch to the ON position.
c. Open SetApp and follow the instructions on the screen (scan the inverter bar-code; move the
ON/OFF/P switch to P position (for less than 5 sec) and release).
The mobile device creates a Wi-Fi connection with the inverter and displays the inverter main
Status screen.
Chapter 6: SettingUpCommunication
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
65
3. Check that S_OK - Server Connected status appears in the main inverter section:
Status
Inverter
SN 07318000C
Power
100 kW
Voltage
277 Vac
Frequency
60.9 Hz
P_OK: 138 of 141
Optimizers Connected
S_OK
Server Connected
Status
Production
Switch
ON
CosPhi
1.00
Limit
No Limit
Country
Netherlands
Voltage
850 Vdc
Temp
156 F
Fan
OK
Commissioning
4. Scroll down to the Communication section and check that the communication options are as
required. For more information refer to Communication Status on page 49.
Communication
LAN
Connected
RS485-1
SE Slave
NC
RS485-2
Modbus
2 of 2
Cellular
N/A
Wi-Fi
NC
ZigBee
NC
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
66
Verifyingthe Connection
Appendix A: Errors and Troubleshooting
This appendix describes general system problems, and how to troubleshoot them. For further assistance,
contact SolarEdge Support.
Identifying Errors
Errors may be indicated in various system interfaces: On the inverter bottom panel, a red LED indicates an
error. In the monitoring platform and the SolarEdge SetApp, errors are displayed with codes.
For more information on the codes displayed for error and warning messages, refer to
http://www.solaredge.com/sites/default/files/se-inverter-installation-guide-error-
codes.pdf.
To identify the error types, use the methods described below.
To identify the error type using the inverter LEDs:
1. Move the ON/OFF/P switch to P position for less than 5 seconds and release it.
2. Observe the LED lights and use the following table to identity the error type
Error type
LED color and state
Red
Green
Blue
Arc detected
ON
OFF
OFF
Isolation or RCD problem
Blinking
OFF
OFF
Grid error
OFF
ON
OFF
High temperature
OFF
Blinking
OFF
Pairing failed
OFF
OFF
ON
Other issue
OFF
OFF
Blinking
To identify the error type using the monitoring platform:
1. Open the site dashboard and click the Layout icon.
Appendix A: Errors andTroubleshooting
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
67
Figure 35: Inverter menu
3. Click the Errors tab. The list is displayed.
Figure 36: Inverter details - Error list
To identify the error type using SetApp:
1. Access the Status screen as described in Viewing System Status on page 46.
2. Check for errors indicated by a red or orange icon (for example:
) . The color indicates error severity
( red is higher severity).
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
68
IdentifyingErrors
P_OK: 138 of 141
Optimizers Connected
S_OK
Server Connected
Status
Production
Switch
OFF
CosPhi
1.00
Limit
No Limit
Country
USA2
Voltage
850 Vdc
Temp
156 F
Fan
OK
Error 18X37: V-Line Max. ›
Switch Off. Production disabled ›
l
Commissioning
Appendix A: Errors andTroubleshooting
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
69
Power Optimizer Troubleshooting
Problem
Possible cause and troubleshooting
Pairing failed
Power optimizers are shaded.
If you connected the inverter to the SolarEdge monitoring
platform, retry pairing remotely (during sunlight). Make sure
to leave the inverter ON/OFF switch ON and that S_OK
appears in the status screen.
String voltage is 0V
Power optimizer(s) output is disconnected.
Connect all power optimizer outputs.
String voltage not 0V but lower than number of
optimizers
Power optimizer(s) not connected in the string.
Connect all power optimizers
Module(s) not connected properly to power optimizer inputs
(not applicable to smart modules).
Connect the modules to the optimizer inputs
String reverse polarity.
Check string polarity using a voltmeter and correct if needed.
String voltage is higher than number of optimizers
WARNING!
If the measured voltage is too high, the
installation may not have a safe low voltage.
PROCEED WITH CARE! A deviation of ±1% per
string is reasonable.
Extra power optimizer(s) connected in the string (not
applicable to smart modules).
Check if an extra power optimizer is connected in the string.
If not – proceed to next solution.
A module is connected directly to the string, without a power
optimizer (not applicable to smart modules).
Verify that only power optimizers are connected in the string
and that no module outputs are connected without a power
optimizer. If the problem persists, proceed to the next step.
Power optimizer(s) malfunction.
o
Disconnect the wires connecting the power optimizers in
the string.
o
Measure the output voltage of each power optimizer to
locate the power optimizer that does not output 1V safety
voltage. If a malfunctioning power optimizer is located,
check its connections, polarity, module, and voltage.
o
Contact SolarEdge Support. Do not continue before
finding the problem and replacing the malfunctioning
power optimizer. If a malfunction cannot be bypassed or
resolved, skip the malfunctioning power optimizer, thus
connecting a shorter string.
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
70
Power Optimizer Troubleshooting
Troubleshooting Ethernet (LAN) Communication
The possible errors and their troubleshooting are detailed in the following table:
Error Message
Cause and Troubleshooting
LAN cable disconnected
Physical connection fault. Check the cable pin-out
assignment and cable connection. Refer to Creating
an Ethernet (LAN) Connection on page 56.
No DHCP
IP settings issue. Check the router and inverter
configuration. Consult your network IT.
Configure Static IP or set to DHCP
Gateway not responding
Ping to router failed. Check the physical connection to
the switch/ router. Check that the link LED at the router
/switch is lit (indicating phy-link). If OK - contact your
network IT, otherwise replace the cable or change it
from cross to straight connection.
No Internet connection
Ping to google.com failed. Connect a laptop and check
for internet connection. If internet access is
unavailable, contact your IT admin or your internet
provider.
For Wi-Fi networks, ensure that user-name and
password are as defined in the internet provider AP/
router.
No connection to SolarEdge servers
Ping or connection to SolarEdge server failed. Check
the SolarEdge server address, under LAN Conf sub-
menu:
Address: prod.solaredge.com
Port: 22222
Check with your network administrator whether a
firewall or another device is blocking transmission.
Troubleshooting RS485 Communication
l
If the message RS485 Master Not Found appears in the Status screen, check the connections to the
master device and fix if required.
l
If after slave detection the number of slaves displayed for the master under RS485-X Conf è Slave
Detect is lower than the actual number of slaves, use one of the following methods to identify missing
slaves and troubleshoot connectivity problems:
o
Use the Long slave Detect to retry connecting to slaves
o
Analyze the slave list to check for missing slaves, and check their connection
Refer to https://www.solaredge.com/sites/default/files/troubleshooting_
undetected_RS485_devices.pdf
Additional Troubleshooting
1. Check that the modem or hub/router is functioning properly.
2. Check that the connection to the internal connector on the communication board is properly done.
Appendix A: Errors andTroubleshooting
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
71
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
72
AdditionalTroubleshooting
Appendix B: Mechanical Specifications
The following figures provide dimensions of the Primary Unit, Connection Unit and Secondary Unit.
Primary Unit and Connection Unit
Figure 37: Primary Unit and Connection Unit - front, side and rear views
Secondary Unit
Figure 38: Secondary Unit - front, side and rear views
Appendix B: MechanicalSpecifications
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
73
Appendix C: SafeDC™
When AC supply to the inverter is shut off (by shutting off the AC breaker at the site), or when the
inverter ON/OFF/P switch is turned to OFF, the DC voltage drops to a safe voltage of 1V per optimizer.
The SolarEdge inverters are certified for compliance with the following standards as disconnection
devices for PV generators, meaning that they can replace a DC disconnect:
l
IEC 60947-3:1999 + Corrigendum: 1999 + A1:2001 + Corrigendum 1:2001 + A2:2005;
l
DIN EN 60947-3
l
VDE 0660-107:2006-03
l
IEC 60364-7-712:2002-05
l
DIN VDE 0100-712:2006-06.
In compliance with these standards, the disconnection mechanism operates as follows:
1. Turn the inverter ON/OFF/P switch, located at the bottom of the inverter, to OFF, or disconnect the
AC by shutting off the AC breaker at the site. The DC voltage displayed on the inverter LCD begins to
decrease.
If the AC breaker was shut off, the LCD does not display. In this case, wait five minutes.
2. When the DC voltage reaches a safe voltage, the PV connectors at the input to the inverter can be
disconnected. A galvanic separation then exists between the PV array and the inverter.
WARNING!
SafeDC complies with IEC60947-3 when installing the system with a worst case SafeDC voltage (under
fault conditions) < 120V.
The worst case voltage is defined as: Voc,max+ (String Length-1)*1V,where:
l
Voc,max = Maximum Voc (at lowest temperature) of the PV module in the string (for a string with
multiple module models, use the max value)
l
String Length = number of power optimizers in the string
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
74
Appendix C: SafeDC™
Appendix D: External Fan Maintenance and
Replacement
The Primary and Secondary Units have two fans each: one is internal and the other is accessible from the
outside of the unit. This appendix describes external fan replacement.
A fan replacement kit is available from SolarEdge.
Figure 39: Primary Unit (left) and Secondary Unit (right) external fans
Fan Maintenance
At least once a year, open the fan screen and clean the accumulated dust using a brush.
If you receive a Not Working Fan Status notification via the SetApp replace the fan as described in the
following section.
External Fan Replacement
1. Turn OFF the inverter ON/OFF switch, and wait until the green LED is blinking , indicating that the DC
voltage is safe (<50V), or wait five minutes before continuing to the next step.
2. Disconnect the AC to the inverter by turning OFF the circuit breakers on the distribution panel.
3. Use a standard screwdriver to unfasten the single screw of the fan cover and open the fan door.
Figure 40: Fan door open
4. Disconnect the fan connector and remove the fan.
Figure 41: Fan connector
Appendix D: ExternalFanMaintenance andReplacement
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
75
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
76
ExternalFanReplacement
Appendix E: Replacing System Components
This appendix details replacement procedures for the SolarEdge system components.
NOTE
If you are permanently disassembling the installation or part of it, make sure to use the disposal
methods dictated by local regulations.
Replacing the Primary Unit
1. Turn OFF the Inverter ON/OFF switch, and wait until the green LED is blinking , indicating that the DC
voltage is safe (<50V), or wait five minutes before continuing to the next step.
WARNING!
If you cannot see the LEDs, or you cannot connect to the Primary Unit management console, or if
the red LED light is on indicating a malfunction, wait five minutes for the input capacitors of the
inverter to discharge.
2. Disconnect the AC to the inverter by turning OFF the circuit breakers on the distribution panel.
3. For a 3-unit inverter first disconnect and remove the Secondary Unit on the right.
4. Open the Primary Unit cover:
a. Release the six Allen screws of the cover.
b. Tilt the top of the cover towards you.
c. Slide the cover down and remove it.
CAUTION!
When removing the cover, make sure not to damage internal components. SolarEdge will not be
held responsible for any components damaged as a result of incautious cover removal.
5. Disconnect all DC, AC wires and the communication connectors from the Primary Unit.
Figure 42: Primary Unit interface
6. Unscrew the two conduit nuts in the Primary Unit securing it to the Connection Unit.
Figure 43: Conduit nuts
Appendix E: ReplacingSystemComponents
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
77
If you remove the Primary Unit and do not immediately install a new one, use insulation tape to
isolate any exposed wires.
8. Place the new Primary Unit on the mounting bracket; insert the screw securing the Primary Unit
through the right side of the heat sink and into the bracket.
9. Connect the DC, AC wires and the communication connectors to the Primary Unit.
10. For a 3 unit inverter reconnect the AC, DC and comm cables from the Connection Unit to the right
Secondary Unit.
11. Close the Primary Unit cover.
12. Perform the commissioning steps as described in Activating, Commissioning and Configuring the System
Using SolarEdge Inverter SetApp on page 34.
13. In the monitoring platform, use the Replace button in the logical layout tab (in site Admin).
Replacing a Secondary Unit
1. Turn OFF the Inverter ON/OFF switch, and wait until the green LED is blinking , indicating that the DC
voltage is safe (<50V), or wait five minutes before continuing to the next step.
WARNING!
If you cannot see Primary Unit LEDs or you cannot connect to the Primary Unit, or if the red LED light is
on indicating a malfunction , wait five minutes for the input capacitors of the inverter to discharge.
2. Disconnect all the connectors on the bottom of the Secondary Unit.
3. Remove the screw securing the Secondary Unit to the mounting bracket and remove the Secondary
Unit from the mounting bracket.
4. Place the new Secondary Unit on the mounting bracket.
5. Insert one of the supplied screws through the outer side of the heat sink and into the bracket.
6. Perform pairing as described in Activating, Commissioning and Configuring the System Using SolarEdge
Inverter SetApp on page 34.
Replacing the Connection Unit
Removing the Connection Unit
1. Turn OFF the Inverter ON/OFF switch, and wait until the green LED is blinking , indicating that the DC
voltage is safe (<50V), or wait five minutes before continuing to the next step.
WARNING!
If you cannot see Primary Unit LEDs or you cannot connect to the Primary Unit, or if the red LED
light is on indicating a malfunction, wait five minutes for the input capacitors of the inverter to
discharge.
2. Disconnect the AC to the inverter by turning OFF the circuit breakers on the distribution panel.
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
78
ReplacingaSecondary Unit
When removing the cover, make sure not to damage internal components. SolarEdge will not be held
responsible for any components damaged as a result of incautious cover removal.
4. Disconnect the Secondary Unit(s) from the Connection Unit .
5. Disconnect the communication connector from the Primary Unit communication board.
6. Unscrew the two conduit nuts in the Primary Unit securing the Connection Unit to it, see Figure 43.
7. Open the Connection Unit cover and disconnect the DC, AC and communication wires.
8. Release the Connection Unit bracket from the wall.
9. Carefully remove the Connection Unit with its mounting bracket from the wall.
Installing a New Connection Unit
1. Position the new Connection Unit below the inverter and from the inside of the Primary Unit grab
the AC and DC wires extending from the switch conduits.
2. Securely screw the two conduit nuts onto the conduit ends in the inverter.
3. Attach the Connection Unit with its bracket to the wall and tighten its screw.
Connecting the Connection Unit to the Primary Unit
1. Connect the DC, as follows, see Figure 42:
l
Connect the red wire to any of the DC+ terminals in the inverter.
l
Connect the black wire to any of the DC- terminals in the inverter.
2. Connect the communication wire to the communication board.
3. Connect the AC wires according to the labels on the AC terminal blocks, as follows:
Three Phase Inverter
Wire type
Connect to terminal
Figure 44: Primary Unit AC terminals
Line 1
L1
Line 2
L2
Line 3
L3
PE (grounding)
Neutral
N
4. Tighten the screws of each terminal with a torque of 1.2-1.5 N*m / 0.88-1.1 lb.*ft.
5. Verify that there are no unconnected wires at the output of the Connection Unit and that any
unused terminal screws are tightened.
Appendix E: ReplacingSystemComponents
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
79
Replacing Power Optimizers
1. Turn OFF the inverter ON/OFF switch, and wait until the LCD green light is blinking, or wait five
minutes before continuing to the next step.
WARNING!
If a malfunction is indicated by the LEDs, wait five minutes for the input capacitors of the inverter to
discharge.
2. Turn OFF the AC breaker and distribution panel on the main distribution panel.
3. Disconnect and replace the necessary power optimizers.
4. Perform pairing
5. In the monitoring platform, use the Replace button in the logical layout tab (in site
Admin). Replace the serial number of the removed power optimizer with the serial
number of the newly installed power optimizer. Refer to
https://www.solaredge.com/sites/default/files/se-monitoring-portal-site-admin.pdf
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
80
ReplacingPower Optimizers
Extended Power Commercial Inverter - Technical Specifications
Three Phase Inverters
Three Phase Inverters for the
Medium Voltage Grid
SE50K1
SE55K
SE82.8K
SE66.6K2
SE100K2
Unit
Output
Rated AC power output
500003
55000
82800
66600
100000
VA
Maximum AC power
output
500003
55000
82800
66600
100000
VA
AC output voltage – line
to line / line to neutral
(nominal)
380/220;400/230
480/277
Vac
AC output voltage range
line to line range: line to
neutral range
318-460;184-264.5
432/528 /249.3-304.7
Vac
AC frequency
50/60± 5
Hz
Maximum continuous
output current (per
phase) @Vac.nom
76
80
120
-
-
A
Maximum continuous
output current (per
phase) @277V
-
-
-
80
120
1Available in the UK and Israel only
2The SE66.6K and SE100K models require a medium voltage transformer
349990 in the UK
1
Extended Power Commercial Inverter - Technical Specifications (Europe & APAC) MAN-01-00457-1.0
Three Phase Inverters
Three Phase Inverters for the
Medium Voltage Grid
SE50K1
SE55K
SE82.8K
SE66.6K2
SE100K2
Unit
Grids supported – three
phase3
3 / N / PE (WYE with Neutral)
Maximum Residual
Current Injection
250 per unit4
250 per unit
Utility monitoring,
islanding protection,
configurable Power
Factor, country
configurable thresholds
Yes
Input
Maximum DC power
(Module STC)
67500 / 33750
74500/37250
11750/37250
90000/45000
135000/45000
W
Transformer-less,
ungrounded
Yes
Maximum input voltage
1000
Vdc
Nominal DC input
voltage
750
850
Vdc
Maximum input current
74
80
120
80
120
Adc
1Available in the UK and Israel only
2The SE66.6K and SE100K models require a medium voltage transformer
3In some countries, the SolarEdge three phase inverters can be connected to delta grids ,refer t o https://www.solaredge.com/sites/default/files/se_three_phase_inverters_for_
delta_grids.pdf. and to Supported Countries application note to confirm compatibility http://www.solaredge.com/sites/default/files/se_inverters_supported_countries.pdf
4If an external RCD is required, its trip value must be ≥ 300mA per unit (≥ 600mA for SE50K/SE55K:≥900mA for SE82.8K)
ExtendedPower CommercialInverter - TechnicalSpecifications
2
Extended Power Commercial Inverter - Technical Specifications (Europe & APAC) MAN-01-00457-1.0
Three Phase Inverters
Three Phase Inverters for the
Medium Voltage Grid
SE50K1
SE55K
SE82.8K
SE66.6K2
SE100K2
Unit
Reverse-polarity
protection
Yes
Ground-fault isolation
detection
350kΩ Sensitivity per unit3
Maximum inverter
efficiency
98.3
98.1
%
European weighted
efficiency
98
%
Night-time power
consumption
< 12
W
1Available in the UK and Israel only
2The SE66.6K and SE100K models require a medium voltage transformer
3Where permitted by local regulations
3
ExtendedPower CommercialInverter - TechnicalSpecifications
Extended Power Commercial Inverter - Technical Specifications (Europe & APAC) MAN-01-00457-1.0
Three Phase Inverters
Three Phase Inverters for the
Medium Voltage Grid
SE50K1
SE55K
SE82.8K
SE66.6K2
SE100K2
Unit
Additional Features
Supported
communication
interfaces
RS485, Ethernet,Cellular GSM (optional)
RS485 Surge Protection
Built-in
DC Safety Unit
DS Disconnect
1000V / 2 x 40A
1000V /3 x 40A
1000V / 2 x 40A
1000V /3 x 40A
DC Surge Protection
Optional, Type II field replaceable
DC Fuses on Plus &
Minus
Optional, 30A
Standard Compliance
Safety
IEC-62109, AS3100
Grid connection
standards3
VDE -AR-N-4105, G59/3, AS-4777,EN50438, CE-1, VDE 0126-1-1, CEI-016,BDEW
Emissions
IEC61000-6-2, IEC61000-6-3, IEC61000-3-11, IEC61000-3-12,
FCC part15 class B
RoHS
Yes
Installation Specifications
Number of units
2
3
2
3
mm
AC Output Cable
Cable range AC - diameter 20-38; Cable range PE - diameter 10-16
mm
1Available in the UK and Israel only
2The SE66.6K and SE100K models require a medium voltage transformer
3For all standards refer to the Certifications category in http://www.solaredge.com/groups/support/downloads.
ExtendedPower CommercialInverter - TechnicalSpecifications
4
Extended Power Commercial Inverter - Technical Specifications (Europe & APAC) MAN-01-00457-1.0
Three Phase Inverters
Three Phase Inverters for the
Medium Voltage Grid
SE50K1
SE55K
SE82.8K
SE66.6K2
SE100K2
Unit
AC Output Cable
Cable range AC - diameter 22-32; Cable range PE - diameter 10-16
Cable range AC -
diameter 20-38;
Cable range PE -
diameter 10-16
Cable range AC -
diameter 22-32;
Cable range PE -
diameter 10-16
Cable range AC -
diameter 20-38;
Cable range PE -
diameter 10-16
DC input3
6 x strings; 4-10mm2 Glands DC wire, gland outer diameter 5-10mm/
2MC4 pairs per unit
pairs 9x strings; 4-
10mm2 Glands DC
wire, gland outer
diameter 5-10mm/
3MC4 pairs per unit
6 strings, 4-10mm2
DC wire, gland outer
diameter
5-10mm/
2MC4 pairs per unit
9 strings, 4-10mm2
DC wire, gland outer
diameter
5-10mm/
3MC4 pairs per unit
AC Output wire
Aluminum or Copper;L,N:Up to 70, PE:Up to 35
Aluminum or
Copper;L,N:Up to
95, PE:Up to 50
Aluminum or
Copper;L,N:Up to
70, PE:Up to 35
Aluminum or
Copper;L,N:Up to
95, PE:Up to 50
Dimensions (HxWxD)
Primary Unit:940x315x260 ; Secondary Unit:540x315x260
mm
Weight
Primary Unit:48; Secondary Unit:45
kg
Operating humidity
Relative Humidity up to 100%
%
Operating temperature
range
-40 to + 604
°C
Cooling
Fan (user replaceable)
1Available in the UK and Israel only
2The SE66.6K and SE100K models require a medium voltage transformer
3Single input option per unit (up to 25mm 2)available
3 The DC input type, MC4 or glands, depends on the part number ordered. Inverter with glands P/N: SExxK-xx0P0BNG4, Inverter with MC4 P/N: SExxK-xx0P0BNU4
4De-rating from 50°C ,refer to the application note at the following link: http://www.solaredge.com/files/pdfs/se-temperature-derating-note.pdf
5
ExtendedPower CommercialInverter - TechnicalSpecifications
Extended Power Commercial Inverter - Technical Specifications (Europe & APAC) MAN-01-00457-1.0
Three Phase Inverters
Three Phase Inverters for the
Medium Voltage Grid
SE50K1
SE55K
SE82.8K
SE66.6K2
SE100K2
Unit
Noise
< 60
dBA
Protection rating
IP65 Outdoor and indoor
Recommended circuit breaker/ fuse size to use at the grid connection point:
Inverter
Maximum
output current (A)
Minimum
fuse Rating (A)
Maximum
fuse rating (A)
SE50k
72.5
100
125
SE55k
80
100
125
SE82.8K
120
150
200
SE66.6k
80
100
125
SE100k
120
150
200
1Available in the UK and Israel only
2The SE66.6K and SE100K models require a medium voltage transformer
ExtendedPower CommercialInverter - TechnicalSpecifications
6
Extended Power Commercial Inverter - Technical Specifications (Europe & APAC) MAN-01-00457-1.0