ABB COMMANDER 300 Operating Instructions Manual

File Specifications

Brand: ABB
Category: Control Unit
Model: COMMANDER 300 (Operating Instructions Manual), prV89hkl.OXjA
File Type: PDF
File Size: —
Pages: 32 pages

Download Document

Get a high-quality, printable PDF version of this manual for offline use.

Download PDF Manual (32 pages)

⚠️ Download Safety: This PDF is completely safe to download (last scan date: 19/05/2026).

Read Online

Read the ABB COMMANDER 300 Operating Instructions Manual online using the built-in PDF viewer.

Key Pages of Document

Serial Data Communication

Supplement COMMANDER 300 50.0 47.5 A1 A2 L R ST M PV SP ...

BS EN ISO 9001

St Neots, U.K. – Cert. No. Q5907 Stonehouse, U.K. – Cert. No. FM 21106 Health and Safety To ensure that our products are safe and without risk to health, the following points must be noted: 1. The relevant sections of these instructions must be read carefully before proceeding. 2. Warning labels on containers and packages must be observed. 3. Installation, operation, maintenance and servicing must only be carried out by s ...

INTRODUCTION .................................. 2

2 PREPARATION ..................................... 2 2.1 Company Standard Settings ....... 2 3 INSTALLATION ..................................... 3 3.1 Serial Communication Adaptors for Personal Computers............... 3 4 ELECTRICAL CONNECTIONS ........... 3 4.1 Serial Connections ...................... 3 5 SETTING UP ........................................ 4 5.1 Termination Re ...

The C300 Series of controllers is extended

by the addition of a serial data communication option which allows addressing and reprogramming via a computer terminal or host computer. The RS422/485 communication standard is used with the following logic levels: a) for logic ‘1’ (MARK condition or IDLE state) the ‘A’ terminal of the transmitter is negative (0V) with respect to the ‘B’ terminal (+5V) b) for logic ‘0’ (SPACE cond ...

Observe the limitations outlined in the

Operating Instructions (IM/C300). The maximum serial data transmission line length for both RS422 and RS485 systems is 1200m. 3.1 Serial Communication Adaptors for Personal Computers An RS422/485 communications adaptor board is required for serial links. It is strongly recommended that the card used has galvanic isolation to protect the computer from lightning damage and increase immunity from noise ...

The protocol used is based on ANSI-X3.28-

1976-2.5-A4 and is used for master (host computer) to slave (C300 Controller) systems. This is the recommended protocol for use with supervisory systems such as ABB Kent-Taylor PC30. The Protocol is: Start transmission (STX) – Command – Identification … End transmission (ETX) – see Figs. 8.1 to 8.6 on pages 7 and 8. Transmission of commands and processing of the subsequent replies must be inc ...

Serial Data Communication Page

7 PROGRAMMING The general programming procedure is as detailed in the Operating Instructions (IM/C300) but with an additional Serial Data page between the Retransmission Output and Scale Adjustment pages – see Fig. 7.1. Page Header – Serial Page. Transmission Rate Select the retransmission rate required (1200 slowest, 9600 fastest). Controller Identification Assign the controller an identification number (01 to 99) ...

Between Master and Slaves

The commands from the master are coded as single characters as follows: R – ‘Read’ (read parameters) M – ‘Multiple Read’ (read a selection of parameters) W – ‘Write’ (write new parameter values). 8.1.1 Mnemonics Each mnemonic for the C300 Controller parameters comprises two characters – see Section 8.6. 8.1.2 Relay Logic Equation (Q1, Q2) The alarm relay assignment is transmi ...

(01 to 99)

Mnemonic (Section 8.6) BCC (optional) Limiter STX Start ETX 8 COMMUNICATION… …8.2 Command Format Fig. 8.1 'Read' Command Format M Command Instrument Identification (01 to 99) Mnemonic (Section 8.6) BCC (optional) Limiter STX Start ETX Fig. 8.2 'Multiple Read' Command Format Command Instrument Identification (01 to 99) Parameter Mnemonic (Section 8.6) BCC (optional) Limiter W Sign (optional for 'Write' co ...

(01 to 99)

Parameter Mnemonic (Section 8.6) BCC (optional) Reply ACK Sign Data (up to 12 characters) …8 COMMUNICATION 8.3 Reply Format – Figs 8.4 to 8.6 The C300 Controller replies to the command using the reply format shown in Figs. 8.4 to 8.6. 8.3.1 Term Clarification for Reply Format Instrument Identification – two characters identifying the C200 Controller, 01 to 99. Data – usually up to six characters (including dec ...

The following examples show typical master-to-slave transmissions and the subsequent slave-

to-master replies. For Error Code and Parameter interpretations refer to Sections 8.5 and 8.6. M STX 05 End of text c) Command – STX M05 MG ETX Command understood Controller number 5 Reply: MG ETX Controller number five 'Multiple Read' command Start of text 05 MV 60.0 ACK 05 IS 0 05 SP 65.0 ACK 05 OP 72.5 ACK ACK Me ...

End of text

e) Command – STX W11A170 ETX A1 70 Command understood Alarm A setting is 70 Reply – 11LA70 ACK LA 70 ETX Write to 70 Alarm A trip point Controller number eleven 'Write' command Start of text ACK Controller number eleven 05 W STX 05 End of text f) Command – STX W05L21 ETX 03 Command not understood Error code 3 Reply – 0503 NAK L2 1 ETX Relay 2 energised Relay 2 state Contr ...

Invalid command – the received command was not R (read), W (write) or

M (multiple read). 02 Invalid 'Read' parameter – parameter cannot be used with Read command. 03 Invalid 'Write' parameter – parameter cannot be used with Write command. 04 Too many characters entered into buffer – received message length is greater than 32 characters. 05 Invalid decimal point position. 08 The 'Write' val ...

Dependent on the programmed display range

Instrument Status IS Yes No Range 0 to 4095 – see Fig. 8.7 on page 10 Control Set Point Value SP Yes No Any value within the programmed display range Remote Set Point Value RP Yes No Any value within the programmed display range Du ...

Control Page Parameters

Time Units TU Yes Yes 0 = Seconds 1 = Minutes Cycle Time CT Yes Yes 1.0 to 300.0 seconds (0.9 = ON/OFF) Hysteresis Value HY Yes Yes 0.0 to 5.0(%) Proportional Band PB Yes Yes 0.1 to 999.9 Integral Action Time IT Yes Yes 1 to 7200 seconds, 7201 = OFF Derivative Action Time DT Yes Yes 1 to 999.9 seconds, 0 = OFF ...

Set-up Process Variable Input Parameters

Input Type I1 Yes Yes 0 = mV 1 = mA 2 = Volts 3 = Ohms 4 = Thermocouple 5 = RTD Lineariser Type W1 Yes Yes 0 = None 1 = Type K 2 = Type R 3 = Type S 4 = Type T 5 = Type J 6 = Type L 7 = Type N 8 = RTD 9 = SQRT 10 = 3/2 11 = 5/2 Lineariser Units U1 Ye ...

Remote Set Point Set Up Parameters

Remote Set Point Input Type I2 Yes Yes 0 = mV 1 = mA 2 = Volts 3 = Ohms 4 = Thermocouple 5 = RTD Remote Set Point Lineariser Type W2 Yes Yes As for Lineariser Type in Set-up Process Variable Input Parameters Remote Set Point Lineariser Units U2 Yes Yes 0 = Degrees C 1 = Degrees F Rem ...

Display Full Scale

DS Yes Yes –9999 to +9999 Display Decimal Point Position DP Yes Yes 0 to 3 positions Display Zero DZ Yes Yes –9999 to +9999 Display Units UM Yes Yes 0 = None 1 = DEG C 2 = DEG F Bar Graph %/Bar Value GI Yes Yes 1 to 10(%) Analogue Output Parameters Analogue Output Full Scale AS Yes Yes 0.0 to 2 ...

Set Up Alarms Parameters (continued)

Process Alarms Hysteresis Value Alarm A Alarm B Alarm C : : Alarm H Alarm J Alarm K HA HB HC : : HH HJ HK Yes Yes Yes : : Yes Yes Yes Yes Yes Yes : : Yes Yes Yes 0.0 to 100.0% or Engineering Units (within the display span), depending on the Alarm Type Process Alarms St ...

Set Up Control Parameters

Power Fail Mode FM Yes Yes 0 = Last 1 = Manual 2 = Auto Power Fail Output Auto-Manual FO Yes Yes 0 to 100.0% Power Fail Output Manual-Manual FP Yes Yes 0 to 100.0% (–0.1 = last manual output) Power Fail Indication Enable PI Yes Yes 0 = No 1 = Yes Power Fail Message PM Yes Yes 0 = No 1 = Yes Auto/Manual Swi ...

Related Devices for ABB COMMANDER 300:

T16
ABB T16
22.06.2026 2 pages

en Warning! Hazardous voltage! The installation and the operation of this device and any maintenance must be carried out by a qualifi ed person in accordance w Official installation manual for the ABB T16 Relays. It describes operating procedures and setup guidelines, installation procedures, troubleshooting guides, error handling.

ZMT Zirconia
ABB ZMT Zirconia
22.05.2026 10 pages

AN-77 SS ZMT Integral reference air supply option avoids necessity for additional equipment. Dual fuel data input with manual or automatic selection from up to Operating and setup manual for the ABB ZMT Zirconia Security System. The manual guides users through detailing setup, safety protocols, device reset instructions.

ACS 6000
ABB ACS 6000
25.03.2026 104 pages

 ABB Switzerland Ltd. All Rights Reserved. ACS 6000 Medium Voltage Drives 3 to 27 MVA Service and Maintenance Manual Document No.: 3BHS202077 ZAB E01 Rev. C Professional manual for the ABB ACS 6000 Controller. The manual covers procedures for device reset instructions, system parameters, performance details, setup tips.

AquaMaster 3 FET200
ABB AquaMaster 3 FET200
07.04.2026 44 pages

User Guide OI/FET200–EN Rev. I AquaMaster 3 FET200 Electromagnetic flowmeter Transmitter The smart solution for remote applications Introduction AquaMaster 3T Device user manual for the ABB AquaMaster 3 FET200 Transmitter. It provides technical information on safety protocols, device safety checks, startup procedures, control functions.

ACS580-01 drives
ABB ACS580-01 drives
18.06.2026 98 pages

English. . . . . . . . 9 Deutsch . . . . . . 19 Español . . . . . . 31 Suomi . . . . . . . 41 Français. . . . . . 51 Italiano. . . . . . . 63 Nederlands . . Operating manual for the ABB ACS580-01 drives Controller. This guide provides technical guidance on network setup, connectivity setup, internal layout.

HT608849
ABB HT608849
07.04.2026 124 pages

Turbocharging Operation Manual / A135-H66 HT608849 Document identification Document number HZTL4030 Revision G Language English Original Operation Manual Produc User instructions for the ABB HT608849 Industrial Equipment. This manual outlines technical specifications, support details, power requirements.

IRC5 Compact
ABB IRC5 Compact
24.07.2026 32 pages

© Copyright 2006 ABB. All rights reserved. Operating manual Getting started, IRC5 and RobotStudio Document ID: 3HAC 027097-001 Revision: B Device user manual for the ABB IRC5 Compact Robotics. This guide explains the features and setup guidelines, usage examples, troubleshooting.

800xA
ABB 800xA
20.06.2026 122 pages

Power and productivity for a better world T System 800xA Multisystem Integration System Version 5.1 Complete user documentation for the ABB 800xA Controller. It provides information on installation and installation procedures, application scenarios, operation, network setup.

Control Unit: Frequently Requested PDF Instructions

WSR-D16214
Voith WSR-D16214
08.06.2026 25 pages

Instruction Manual Voith Turbo Way Valve WSR-D16214 2005 / 03 aie Voith Turbo GmbH & Co. KG Page: 1 / 24 9183626018945 en D – 74564 Crailsheim Version: 2.0 7 Instruction reference guide for the Voith WSR-D16214 Control Unit. The document includes device operation tips, device features, hardware components, usage procedures.

TPG 300
Pfeiffer Vacuum TPG 300
12.05.2026 50 pages

OPERATING INSTRUCTIONS EN Translation of the Original PLUG-IN BOARDS for total pressure measuring and control units TPG 300/TPG 500 Professional user manual for the Pfeiffer Vacuum TPG 300 Measuring Instruments. This guide provides technical guidance on user instructions, service instructions, diagnostic information.

GS7000
Cisco GS7000
15.08.2026 72 pages

Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide First Published: 2018-03-23 Americas Headquarters Cisco Systems, Inc. 170 West Usage and setup manual for the Cisco GS7000 Network Hardware. This documentation details dimensions and layout, device overview, functional overview, network setup.

UPS5000-E-400K-SMS
Huawei UPS5000-E-400K-SMS
20.08.2026 145 pages

UPS5000-E-(400 kVA-600 kVA) User Manual (60 kVA Power Modules) Issue 07 Date 2022-06-20 HUAWEI DIGITAL POWER TECHNOLOGIES CO., LTD. Official installation manual for the Huawei UPS5000-E-400K-SMS Control Unit. This guide includes network setup, technical overview, specifications, startup procedures.