Bunn SINGLE SH DBC Operating Manual
Text of Bunn SINGLE SH DBC Operating Manual
INSTALLATION & OPERATING GUIDE
BUNN-O-MATIC CORPORATION
POST OFFICE BOX 3227
SPRINGFIELD, ILLINOIS 62708-3227
PHONE: (217) 529-6601 FAX: (217) 529-6644
To ensure you have the latest revision of the manual or to obtain the illustrated parts catalog, please visit
the Bunn-O-Matic website, at www.bunn.com. This is absolutely FREE, and the quickest way to obtain
the latest catalog and manual updates. Contact Bunn-O-Matic Corporation at 1-800-286-6070 to o
This brewer incorporates a wireless interface system that allows the DBC Grinder to load certain informa-
tion into the "programming chip" located inside the handle of the funnel. This information includes the name
of the coffee ground and what batch size will be brewed (small, medium, or large). Once the correct name and
amount of coffee is ground, the funnel is loaded into the brewer. The information from the funnel handle is then
t
Bunn SINGLE SH DBC The notices on this brewer should be kept in good condition. Replace unreadable or damaged labels.
37881.0000
This equipment must be installed to comply
with the International Plumbing Code of the
International Code Council and the Food
Code Manual of the Food and Drug Adminis-
tration (FDA). For models installed outside
the U.S.A., comply with the applicable
Plumbing /SanitationCode.
03408.0
ELECTRICAL HOOK-UP (Models without power cord)
CAUTION – Improper electrical installation will damage electronic components. Damage caused by incorrect
electrical connections is not covered by warranty.
1. An electrician must provide electrical service as specified in conformance with all local, state and federal
electrical codes.
2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
• This appliance must be installed in locations where it can be overseen by trained personnel.
• For proper operation, this appliance must be installed where the temperature is between 5°C to 35°C.
• Appliance shall not be tilted more than 10° for safe operation.
• An electrician must provide electrical service as specified in conformance with all local and national codes.
• This appliance must not be cleaned by water je
(a) MAIN ON/OFF SWITCH
This switch, located under the brewer behind the right front leg, turns power on and off to all components
in the brewer.
(b) BATCH SELECTOR SWITCHES
Pressing the switch corresponding to the Small, Medium, or Large batch selects the amount of coffee to
be brewed. Pressing a different switch after a brew cycle has been initiated does not change the brew batch in
progress. Light indicates th
CAUTION: The brewer must be disconnected from the power source throughout the initial setup, except when
specified in the instructions.
1. Insert an empty funnel into the funnel rails of the brew station.
2. Place an empty server under the funnel.
3. Connect the brewer to the power source. Water will begin flowing into the tank and stop when the tank is
filled to its capacity. Display will show PLEASE WAIT...TANK FIL