Bunn SINGLE TF DBC W/SMART FUNNEL Installation & Operating Manual

Text of Bunn SINGLE TF DBC W/SMART FUNNEL Installation & Operating Manual

POST OFFICE BOX 3227

SPRINGFIELD, ILLINOIS 62708-3227 PHONE: (217) 529-6601 FAX: (217) 529-6644 www.bunnomatic.com INSTALLATION & OPERATING MANUAL 35879.0000E 04/05 ©2003 Bunn-O-Matic Corporation SINGLE TF DBC W/SMART FUNNEL®

BUNN-O-MATIC COMMERCIAL PRODUCT WARRANTY

Bunn-O-Matic Corp. (“BUNN”) warrants equipment manufactured by it as follows: 1) All equipment other than as specified below: 2 years parts and 1 year labor. 2) Electronic circuit and/or control boards: parts and labor for 3 years. 3) Compressors on refrigeration equipment: 5 years parts and 1 year labor. 4) Grinding burrs on coffee grinding equipment to grind coffee to meet original factory screen sieve

TABLE OF CONTENTS

User Notices .............................................................................................................................. 4 Electrical and Plumbing Requirements ...................................................................................... 5 Operating Controls..................................................................................................................... 6 Initial Setup ...............

Bunn SINGLE TF DBC W/SMART FUNNEL The notices on this brewer should be kept in good condition. Replace unreadable or damaged labels.

10044.0000 03408.0000 03409.0000 ! CAUTION Do not connect to a circuit operating at more than 150 volts to ground. 27508.0000 35879 082203

CAUTION – Improper electrical installation will damage electronic components.

1. An electrician must provide electrical service as specified. 2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source. 3. Remove the front, lower left access panel beneath the sprayhead. 4. Feed the cord through the strain relief and connect it to the terminal block. 5. Connect the brewer to the power sourc

(a) BATCH SELECTOR PADS

Pressing the pad corresponding to the Small, Medium, or Large batch selects the amount of coffee to be brewed. Pressing a different pad after a brew cycle has been initiated does not change the brew batch in progress. Light indicates the selected batch to brew. (b) ON/OFF PAD Pressing the ON/OFF pad alternately turns the brew cycle on and off. Pressing this pad during the br

Bunn SINGLE TF DBC W/SMART FUNNEL CAUTION – The brewer must be disconnected from the power source throughout the initial setup, except when

specified in the instructions. 1. Insert an empty funnel into the funnel rails of the brew station. 2. Place an empty server under the funnel. 3. Connect the brewer to the power source. Water will begin flowing into the tank and stop when the tank is filled to its capacity. Display will show PLEASE WAIT...TANK FILLI

1. The use of a damp cloth rinsed in any mild, nonabrasive, liquid detergent is recommended for cleaning all

surfaces on Bunn-O-Matic equipment. Do NOT clean this equipment with a water jet device. 2. Check and clean each sprayhead. The sprayhead holes must always remain open. NOTE: Any buildup on the sprayhead may restrict water flow, and impact your coffee brewing. For consistently great coffee, clean spratheads weekly. Upon

AD CARD: An assembly consisting of computer chips and an instruction label. Used for loading advertising

messages into the brewer. BREW LOCKOUT: The inability to initiate a brew if the water temperature is less than the ready temperature programmed into the brewer. BYPASS: The process of diverting a portion of the brew water to the outside of the paper filter so that it does not pass through the coffee grounds. This process is sometimes us

Using the menu-driven display on the front of the brewer, the operator has the ability to alter or modify

various brewing parameters such as brew temperatures, brew volumes, bypass percentages, etc. This allows for the precise brewing of various flavors of coffee. Programming of the brewer is achieved by entering a certain function. Then, by the use of hidden programming switches, the operator can customize the brewing process to their

This screen will be shown when the brewer is

ready for use. The screen displays the water tempera- ture in the tank. When the water in the tank reaches the correct set temperature, the display will change from HEATING to READY TO BREW. PROGRAMMING LOCKOUT SWITCH (mounted on main control board) This switch can be set to prevent access to the programming levels of the brewer. Once all the correct brew settings are programmed, the operator

PROGRAMMING THE BREWER (cont.)

PROGRAM FUNCTIONS - LEVEL 2 There are three methods of programming the various brewing parameters of the Single™ TF DBC™ with Smart Funnel® Brewer. METHOD 1: Using a Smart Funnel® and a G9-2T DBC Grinder: Certain coffee NAMES are stored in the G9-2T DBC's memory. When a particular name of coffee is ground into the Smart Funnel®, that name and the batch size selected are transferred from the grinder to the progr

Bunn SINGLE TF DBC W/SMART FUNNEL PROGRAMMING FUNCTIONS - LEVEL 2 (cont.)

Procedure for Setting the Recipe: NOTE: Before beginning setup, place a server beneath the brew funnel. 1. Insert the funnel into the grinder and select a batch size to grind. It is not necessary to have coffee beans in the hopper(s) in order to program the brewer. The coffee name is pre-selected and stored in the grinder's memory for the side being ground. 2. Press the pad. When the grinder stops grin
PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) SET NEW RECIPES (cont.) ounces, to be dispensed for that particular batch size. 9. When finished, press another batch size and re- peat step #8 for that size. Continue setting all batch sizes. 10. When finished setting all batch sizes, press and release DONE. The display should read 3 BATCH SIZES DONE? 11. If the three batch sizes are not correct, press and release NO to return to the BREW OUNCES setup scree

cycle will delay (after the presoak cycle shuts off)

before resuming brewing. 23. When finished, press another batch size and re- peat until all three batch sizes are set. 24. When finished setting all batch sizes, press DONE. The display will show the ON and OFF TIMES that were entered for a particular batch size. After a 5 second delay, the display should read 3 BATCHES DONE. 25. If the three batches are not complete, press NO in order to return
PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) SET NEW RECIPE Using a RECIPE CARD to load coffee names and brew settings into the Brewer with Smart Funnel®: The G9-2T DBC's memory contains certain coffee names. If the operator uses a coffee name that is not already stored in the grinder's memory, a RECIPE CARD can be obtained from the factory. The RECIPE CARD would include all the information needed to set up that particular coffee name. The information
PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) SET NEW RECIPE: If not using a Smart Funnel® (with a sensor coil) and/ or a G9-2T DBC Grinder, the brewer will function as a standard Bunn® Single™ TF DBC™ Brewer: It is possible to operate the brewer without using a Smart Funnel® and/or a G9-2T DBC Grinder. If a standard funnel, or if a non-DBC grinder is used the brewer will automatically select a NO NAME coffee flavor when the pad is pressed. This

REVIEW RECIPES/MODIFY RECIPES/SET UP NO

NAME COFFEE FLAVORS: This function has three parts. It allows the opera- tor to view the brew settings for the various coffee names programmed into the brewer. It also allows the operator to modify (change) any of the BREW VOLUMES, BYPASS PERCENTAGES, PULSE BREW TIMES, PRE-INFUSION TIMES and DRIP-OUT TIMES for a particular coffee name pro- grammed into the brewer. Finally, this function is used to set up the

Bunn SINGLE TF DBC W/SMART FUNNEL BREW OZ (SETTING OR ADJUSTING BREW VOL-

UMES) This function allows adjustment of the brew vol- umes for each batch. The indicator signifies volume in ounces per batch. Procedure for modifying recipes - brew ounces: Range: 10.0 oz to 400 oz for all three batch sizes 1. Press and hold the ® pad until the display reads SET NEW RECIPES. Release the ® pad. Press the ® until the display reads REVIEW RECIPES. 2. Press YES to proceed. The display should
PROGRAMMING FUNCTIONS - LEVEL 2 (cont.) % BYPASS This function allows adjustment of the amount of water that bypasses the grounds. The number signi- fies the percentage of the brew volume which does not flow over the coffee grounds. Modifying recipes - bypass percentages: Range: 0% to 90% for all three batch sizes NOTE: If the brewer is already in the % BYPASS screen, it is not necessary to follow steps 1 through 6 in this section, but proceed dire

Bunn Coffee Maker Owners Instructions: