Amit RRU-WTB/AN01 Operation Manual

File Specifications

Brand: Amit
Category: Measuring Instruments
Model: RRU-WTB/AN01 (Operation Manual), prryAV3qhTJDo
File Info: Adobe Acrobat PDF (DjVu)
File Size: —
Pages: 28 pages

Download PDF

Download Amit RRU-WTB/AN01 Manual (28 pages)

Read Online:

Read the Amit RRU-WTB/AN01 Operation Manual online using the built-in PDF viewer. This document explains how to operate the device, adjust settings and perform regular maintenance.

Key Pages of Document

8. Indications and settings

8.1. System LEDs Fig. 9 - Front panel LEDs detail (System LEDs) LED Color PW Yellow RN Green S0 Red S1 Green LED Status Meaning PWR Lights Power supply voltage indication RN Blinks, T = 2 s Operation state Blinks, T = 200 ms Service mode S1 Blinks FW update is running S0 Blinks Error status ...

9. Mounting, installation rules

Amit RRU-WTB/AN01 9.1. Mounting instructions Analyser RRU-WTB/AN01 is intended to be mounted into 19“ subrack. After the analyser is put in to rack it must be fixed with four screws in plastic sleeves in four corners of front panel. 127 122 4x A A: Fig. 10 - Mounting into 19“ subrack If needed, analy ...

Fig. 11 - Fixing, when mounting in to frame.

Amit RRU-WTB/AN01 Keep the free space at least 70 mm in front of WTB gateway for attaching the cables. It is very important to ensure that ambient temperature does not exceed the allowed limits. At the same time it is necessary to ensure that the heat radiating equipment located nearby does ...

AMiT, spol. s r.o. does not provide any warranty concerning the contents of this

Amit RRU-WTB/AN01 publication and reserves the right to change the documentation without obligation to inform any body or authority about it. This document can be copied and redistributed under following conditions: 1. The whole text (all pages) must be copi ...

8.2. Service mode and factory setting

Amit RRU-WTB/AN01 RSTR button is used to enter service mode and to restore factory settings. To press the button, use a tool with maximum diameter of 1.5 mm. To enter service mode press and hold the RSTR button during analyser start up. Release the button after beginning of RN LED blinking. The quic ...

5. Conformity assessment

Providing that RRU-WTB/AN01 analyser is correctly used, it will comply the requirements of Czech governmental decree NV616/2006. The conformity assessment has been carried out in accordance with harmonized standard EN 50121-3-2:2006. Tested in accordance with standard Type of test Classificatio ...

6. Power supply

Amit RRU-WTB/AN01 The RRU-WTB/AN01 WTB analyser can be powered by 24 V DC vehicle on-board network. 6.1. Powering from DC network Power supply is connected to X1 WAGO 769-663 (X-COM®), plug. Fig. 4 - Power supply connector location Connector WAGO 769-663/003-000 Terminal Signal Signal wiring on RRU-WTB/AN01 1 PE Unit c ...

Amit RRU-WTB/AN01 user guide recommended for: MC 300 2A, PIPER 100, Wile 25, FieldIT AquaMaster, U3000.

⚠️ Download Safety

The Measuring Instruments Operation manual (28 pages) is completely safe to download (last scan date: 06/03/2026).

Measuring Instruments: Frequently Requested PDF Instructions