-
Software Version: V.4.27G
1
-
Table of Contents
2
-
Notes on Safety Conventions and Symbols
6
-
FM Approval Type XP
8
-
CSA Approval Type Ex d[ia]
9
-
TIIS Approval Type Ex d
10
-
IEC Approval Type Ex d -40°C
11
-
Drum Housing Pressure Rating; Material:
12
-
HART (NMT5xx, NRF560, pressure transmitter)
13
-
O-ring; chamber finishing:
14
-
Scope of Delivery
15
-
Incoming Acceptance, Transport, and Storage
16
-
Terms Related to Tank Measurements
17
-
Design and Dimensions
18
-
Necessary Tools for Installation
19
-
Mounting of NMS5
20
-
Mounting without Guide System
21
-
Mounting NMS5 with Guide Wire
23
-
Type of Tanks
25
-
Preparation for Mounting of NMS5
27
-
Removing Packing Materials for All-in-one
29
-
Displacer Shipped Separately
30
-
Displacer Installation - 5B
32
-
Ex d, Output 1 : V1, Modbus RS485, HART, Enraf BPM
34
-
Exd, Output 1: Whessoe Matic 550 (WM550) Protocol
36
-
Exd, Output 1: Mark/Space (M/S) Protocol
38
-
Exd [ia], Output 1: Mark/Space (M/S) Protocol
39
-
Temperature Input System
41
-
Ex ia NMT Input + HART Input
42
-
Touch Control and Programming Matrix
43
-
Figure. 48: Matrix Construction
44
-
Operation Command and New Operation Status
49
-
Seeking middle I/F level
50
-
Operation of Displacer
51
-
Calculation of Level and Densities
52
-
Upper/Lower Stop (GVH161/162)
55
-
Analogue Output (GVH250 to 256)
56
-
Settings for NMT 53x Connections
57
-
Settings for Connection to NRF560
58
-
Liquid Level Calibration
59
-
Level Calibration Procedure for Closed Tank
60
-
Level Calibration 2
61
-
Mark/Space(M/S) Communication Board Setting
63
-
ENRAF Bi Phase Communication Board (COM-3) Setting
64
-
Contact Relay Alarm Output
66
-
I/O - 3
67
-
Density and Density Profile Measurements
69
-
Density Profile Measurement
70
-
G8V4H1 OPE. POINT
72
-
G8V4H6 LIQ. WAIT TIME
73
-
Density Profile Operation Diagram
75
-
Sealing of NMS5
77
-
Ball Valve NHV4A
80
-
Diagnosis and Troubleshooting
81
-
Error and Status Messages
82
-
Flowcharts for Diagnostics and Troubleshooting
84
-
Adjust G4V8H6 from
85
-
Check HART bus wiring:
86
-
Check local power supply
87
-
Enter correct number of
88
-
Setting after Parts Replacement
90
-
Maintenance Prediction Function
91
-
Order Code List
93
-
PCB CPU Carrier set complete, spacer
94
-
10.9 Gauge Software
96
-
Displacer and Measuring Wire
97
-
Alarm History Display
98
-
List of Alarm Messages
99
-
Do not let wire fall off the wire drum.
100
-
Initial Weight Calibration
101
-
6. Press "E" at "Displacer
102
-
Weight Table Calibration and Density
103
-
Figure. 103: Calibration 3-B
104
-
*1 PTB reference conditions
105
-
NMS5 Programming Matrix (Static Matrix)
106
-
HART ERROR RATE
113
-
Description of Programming Matrix
116
-
selection, or displa
117
-
selection, or display
118
-
RS 485 MODBUS (COM- 5) Terminator
152
-
2 COMM-5 RS- 485 Communication Module from 2009
153
-
Measurement Wire Replacement
154
-
Fixing Wire Procedure
155
-
Mount the displacer on the wire ring.
156
-
PTFE Displacer Installation
157
-
Figure. 114: Dimension of Displacer 2
159
-
Figure. 115: Dimension of Displacer 3
160
-
Endress+Hauser Yamanashi Co., Ltd.
162