ETS PinPulse Operating Manual
Text of ETS PinPulse Operating Manual
www.electrotechsystems.com (833) ESD-GURU (833-373-4878)
D00219 – Revision E – 20190722
ESD Testing System
Model 9910 PinPulse™/PinScan™
Operating Manual
www.electrotechsystems.com 833-ESD-GURU (833-373-4878)
D00219 Revision E – 2019-07-19 - Page 2
Table of Contents
I. IMPORTANT SAFETY INFORMATION .................................................................................................................... 3
II. DESCRIPTION OF CONTENTS ............................................................................................................................... 5
III. SETUP GUIDE ............
www.electrotechsystems.com 833-ESD-GURU (833-373-4878) D00219 Revision E – 2019-07-19 - Page 3
I. IMPORTANT SAFETY INFORMATION
WARNING: Equipment contains High Voltage.
The equipment described in this Manual is designed and manufactured to operate within
defined design limits. Any misuse may result in electric shock, damage to equipment, or fire.
To prevent these unwanted events, the following rules should be observed for installation, use
and mai
www.electrotechsystems.com 833-ESD-GURU (833-373-4878) D00219 Revision E – 2019-07-19 - Page 4
DO NOT OPERATE WITH SUSPECTED EQUIPMENT FAILURES. If any odor or
smoke becomes apparent turn off the equipment and unplug it immediately. Failure to do so
may result in electrical shock, fire or permanent damage to the equipment. Contact the factory
for further instructions.
DO NOT OPERATE IN WET/DAMP CONDITIONS: If water or other liquid penetrates
the equ
www.electrotechsystems.com 833-ESD-GURU (833-373-4878) D00219 Revision E – 2019-07-19 - Page 5
II. DESCRIPTION OF CONTENTS
1. The ETS PinScan consists of an
automation system mated with the ETS
9910 PinPulse discharge simulator. A
testing deck at the top mounts devices to
be tested and an acrylic safety cover
encloses the test area.
2. A laptop PC computer pre-loaded with
windows-10 and the necessary PinScan
Test Manager software loaded and
opera
www.electrotechsystems.com 833-ESD-GURU (833-373-4878) D00219 Revision E – 2019-07-19 - Page 6
III. SETUP GUIDE
STEP 1:
Set up the system on a clean well-illuminated work
area.
STEP 2:
Plug in the 2 USB cables. One cable is a USB Type
A –to- RS232 (DB9) cable which connects the 9910
(lower) electronics to the computer. The other
cable is a USB Type A –to- USB Type A cable which
connects the PinScan transport (upper) electronics
to the computer
www.electrotechsystems.com 833-ESD-GURU (833-373-4878) D00219 Revision E – 2019-07-19 - Page 7
STEP 5:
Attach the discharge cables. Choose the pair
of cables for the discharge model you are
using: HBM, HMM, or MM. Attach the ground
cable from the GND (silver) banana jack on the
PinPulse tower to the right-hand clip-on
ground terminal on the PinScan Deck. Plug
the positive cable into the labeled color-coded
banana jack on the PinPulse tower, (
www.electrotechsystems.com 833-ESD-GURU (833-373-4878) D00219 Revision E – 2019-07-19 - Page 8
STEP 9:
Click on the PinScan Test Manager icon . The
Operator Screen will open as shown with
operating buttons across the top of the
window. The yellow highlighted instruction
fields are important – they display status
updates and requests for operator action.
(Program Control):
The Test Manager will indicate the running
condition by the appearance of
www.electrotechsystems.com 833-ESD-GURU (833-373-4878) D00219 Revision E – 2019-07-19 - Page 9
IV. QUICK START GUIDE
After setting up the system as described above, PinScan is ready to operate. This section
covers the steps necessary to create a quick no-frills test, without considering options or
customization. The quick start process is as follows:
START PROCEDURE:
•
After launching the PinScan Test Manager , the yellow banner will display
www.electrotechsystems.com 833-ESD-GURU (833-373-4878) D00219 Revision E – 2019-07-19 - Page 10
•
The first time the system is run, a check of the COM ports is recommended. The PC is
shipped with the COM ports properly configured, however this is not completely dependable
in the windows environment. See Appendix B for COM Port Setup.
•
Click on the RUN TEST button to create a new test. PinScan will create a new number for
your test, a 4-digit
www.electrotechsystems.com 833-ESD-GURU (833-373-4878) D00219 Revision E – 2019-07-19 - Page 11
4.3. CONFIRM THE VOLTAGE SCRIPT
For each pin pair in the PinScript, a sequence of discharge pulses will be applied, at specific
voltages listed in the Voltage Script. (A.K.A. “VScript”)
The system will have a Voltage Script loaded and ready to run and its number will appear in the
VScript Ref# field. (7001 as shown in the example above). Click on G
www.electrotechsystems.com 833-ESD-GURU (833-373-4878) D00219 Revision E – 2019-07-19 - Page 12
4.6. SELECT THE ESD MODEL
Leave this model as-is:
4.7. SELECT THE CURVE TRACE OPTION
Click on Option 2 – CT after each discharge:
Accept these 3 options by clicking GO.
4.8 RUN THE TEST.
The system is now ready to begin the test. Click GO
*** TESTING BEGINS ***
PinScan starts the following sequence of actions:
•
The PinScan transport will move
www.electrotechsystems.com 833-ESD-GURU (833-373-4878) D00219 Revision E – 2019-07-19 - Page 13
Live test status display:
NOTE: The following Curve Trace and PinCheck displays only apply if Curve Tracing is active.
•
To the right of the Test Status area is the Curve Trace
chart. If curve tracing is selected, a plot will appear
here of current vs. voltage for the pin pair presently
addressed. A typical diode characteristic is shown at
the right.
www.electrotechsystems.com 833-ESD-GURU (833-373-4878) D00219 Revision E – 2019-07-19 - Page 14
•
PinScan computes the variance of the
PinCheck numbers for each pin, for an
indication of how constant the traces are
across all the discharges. Then the results
are shown in the Variance Report. This is
sorted by variance, so any problem pins as
indicated by a high variance show up at the
start of the list. This chart is updated live
when the testi
www.electrotechsystems.com 833-ESD-GURU (833-373-4878) D00219 Revision E – 2019-07-19 - Page 15
Four yellow buttons will be activated: Next CT and Prev CT for individual navigation among the
curve traces, and Next Pin and Prev Pin for navigation by device pin.
•
Click on “Next CT” to step to the next curve trace,
•
Click on “Prev CT” to step back to the previous curve trace.
•
Click on “Next Pin” to step ahead to the following pin,
www.electrotechsystems.com 833-ESD-GURU (833-373-4878) D00219 Revision E – 2019-07-19 - Page 16
V. OPERATION GUIDE
5.1. Organization of the System
An organization block diagram of PinScan ESD testing is shown below.
The first step is to formulate a Test Plan and the objectives of the test, and this will dictate the Voltage
ranges and pin combinations to be examined. The system can address any pair of pins on the device, and
can apply discharge wav
www.electrotechsystems.com 833-ESD-GURU (833-373-4878) D00219 Revision E – 2019-07-19 - Page 17
The Adapter board plugs into the PinScan Stage. This makes all of the Device pins accessible to PinScan
for testing. The picture below shows an Adapter board mounted on the left half of the PinScan Stage. This
is a 64 pin Adapter board and two simple 3-lead components are mounted on it.
Adapter boards can be configured to handle a single large device or